Menu

Close

  1. Yokohama-shi Top Page
  2. Business
  3. Menu by field
  4. Environment, parks and sewers
  5. Living Environment conservation
  6. Air and odor
  7. Smoke and smoke
  8. Procedures for small-scale fixed internal combustion engines and gas turbines

The text is from here.

Procedures for small-scale fixed internal combustion engines and gas turbines

Last updated on April 10, 2024.

Among the specified small-scale facilities stipulated in Article 83 of the Ordinance on conservation, etc. of Yokohama City Living Environment (hereinafter referred to as the “Ordinance”), the outline of notification procedures and guidance standards for small-scale fixed internal combustion engines and gas turbines is explained.
In addition, about thing of scale corresponding to soot generating facility of Air Pollution Control Law, report procedure of soot generating facility is necessary, and, when the facility corresponds to designated facility of the regulations, procedure such as permission application of the regulations is necessary. Is required.
※Due to the revision of the ordinance on the conservation, etc. of Yokohama City Living Environment, notification of gas heat pumps (GHP) is no longer required from October 1, 2021. (Pamphlet (PDF: 231KB)

1 About target facilities

Small-scale fixed-type internal combustion engines and gas turbines subject to notification procedures and guidance standards are facilities prescribed based on Article 83 of the Ordinance, and are as follows. In this page, if it is described as a small fixed internal combustion engine or gas turbine, it refers to the scale shown here.
Major installation examples include gas heat pumps (GHPs) used in building air conditioning and gas engines used in cogeneration systems.

Table
Type of facilitiesScale
Diesel engine
Gas turbine
Fuel with a fuel equivalent combustion capacity of less than 50L/h and a rated output of the prime mover of 7.5 kW or more
Gas engine
Gasoline engine
Fuel with a fuel equivalent combustion capacity of less than 35L/h and a rated output of the prime mover of 7.5 kW or more

[Note]
For diesel engines or gas turbines with a fuel oil equivalent combustion capacity of 50L / h or more, gas engines or gasoline engines with a fuel equivalent to 35L / h or more, the Air Pollution Control Law corresponds to a soot generating facility specified by, and it is necessary to submit a notification procedure for a soot generating facility. In this case, if the facility corresponds to a designated facility (PDF: 370KB) prescribed in the ordinance, procedures such as permission application for the ordinance are also required.

2 Outline of the notification procedure

When installing or changing small-scale fixed-type internal combustion engines and gas turbines, or when the corporate representatives listed in the notification of small-scale fixed-type internal combustion engines and gas turbines are changed, the ordinance is required. Notification procedure is required.

Table
Laws and regulationsFacilitiesProceduresContents
Ordinance on conservation, etc. of Yokohama City Living EnvironmentSmall-scale fixed internal combustion engines and gas turbinesNotification※Installation, change, name change, succession, abolition, etc.

※Guidance standards are applied to GHPs with fuel equivalent fuel oil equivalent combustion capacity of less than 10L/h of gas engines, but notification is not required.

3. Guidance Standards

Based on Article 84 of the Ordinance, guidance standards for small-scale fixed internal combustion engines and gas turbines have been established and must be complied with. Guidance standards stipulate the emission concentration standards for nitrogen oxides in order to prevent air pollution due to smoke emitted from small fixed internal combustion engines and gas turbines.

4 Notification procedures for small-scale fixed-type internal combustion engines and gas turbines

Please confirm the details of report at window of department in charge beforehand by all means. For the notification, please fill out the prescribed form with required items and submit the attached documents explaining the details. Also, please unify the size of the registration form documents to A4 and fold large drawings to A4.
In addition, we may not be able to accept documents if there are incomplete documents, so please allow enough time for submission.
※Of the gas engines, GHPs with a fuel equivalent combustion capacity of less than 10L/h do not need to submit a report on (1) to (5).
(1) Notification of installation of small-scale fixed internal combustion engines and gas turbines

Table
Subsidiary provisionsOrdinance Article 86, Paragraph 1
StyleEstablishment of specific small-scale facilities registration form [Details No. 15 style] (outside site)
※There are styles from (1) to (3), but please submit (1) and (2). Submission of (3) is not required.
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineUp to 30 days before the installation date
RemarksIn the case of notification, please consult with the section in charge in advance.

[attached documents]
Depending on the content of the notification, in addition to the materials shown here, there may be cases where it is necessary or unnecessary, so please check at the counter at the time of notification. In addition, multiple contents may be summarized in one drawing, but be careful not to make the contents difficult to understand.

Table
DocumentsRemarks
Guide mapPlease attach a map that shows the location of the establishment where the facility is set up.
Floor plan of business sites
(Layout of facilities)
Indicate the location of the facility to be installed, and mark it with a color pen. Please fill in the facility number and facility name.
ElevationsIndicate the location of the facility to be installed, and mark it with a color pen. Please fill in the facility number and facility name.
Fuel piping diagramSpecify the position of the flow meter.
Flue diagramShow the flue from the facility to be installed to the chimney, and specify the position of the measurement mouth and the inner diameter of the flue at the measurement mouth installation location.
Structure diagram of the chimneySpecify the height and inner diameter of the outlet from the ground.
Certificate of nitrogen oxide concentrationAttach the manufacturer's warranty regarding the concentration of nitrogen oxides in the exhaust gas of the facility to be installed. The emission concentration should be understood by the value converted by the standard oxygen concentration for each type and scale of the facility specified in the guidance standard.
Structure of facilities, catalogs, etc.Attach a document that shows the structure of the facility to be installed, fuel type, fuel consumption, and the rated output of the prime mover.
Materials, catalogs, etc. on how to prevent air pollutionWhen installing exhaust gas treatment facilities, etc., please attach a copy that shows the contents (processing method, treatment efficiency, emission concentration, etc.).
OthersPlease attach necessary instructions according to the content of the notification.

(2) Notification of succession of small-scale fixed internal combustion engines and gas turbines

Table
Subsidiary provisionsOrdinance Article 86, Paragraph 2
StyleSuccession of specific small-scale facilities registration form [Details Ordinance No. 16 style] (outside site)
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineWithin 30 days from the date of succession
Details of notificationSuccession of small-scale fixed combustion engines and gas turbines
RemarksMake sure that all small fixed internal combustion engines and gas turbines installed at the business site are succeeded or some facilities have been succeeded. In the case of succession of some facilities, make them so that you can understand the model number or facility number of the facilities that have been succeeded, and attach the layout of the facilities as necessary.

(3) Notification of changes to small-scale fixed internal combustion engines and gas turbines

Table
Subsidiary provisionsOrdinance Article 87, Paragraph 1
StyleChanges related to specific small-scale facilities registration form [Details Regulations No. 17 style] (outside site)
※Attach (2) from styles (1) to (3) of registration form (Details Ordinance No. 15) with specific small facilities.
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineUp to 30 days before the date of change
Details of notificationChanges in installation locations, structures, and methods for treating smoke exhaust, etc. of small-scale fixed internal combustion engines and gas turbines
RemarksPlease note the following:
  • In the case of renewal of facilities, notification procedures for the abolition of old facilities and the establishment of new facilities are required.
  • Change of setting place of facility means relocation within the same establishment. In the case of relocation to another business establishment, it is necessary to abolish the facility and notify the installation, and the facility after the relocation will be subject to the nitrogen oxide emission concentration standard as a new treatment.

[attached documents]
Depending on the content of the notification, in addition to the materials shown here, there may be cases where the same thing as attached documents in “(1) Notification of installation of small-scale fixed internal combustion engine and gas turbine” is required or unnecessary. Please check at the counter at the time of notification. In addition, multiple contents may be summarized in one drawing, but be careful not to make the contents difficult to understand.

Table
DocumentsRemarks
Establishment of specific small-scale facilities registration form (Form No. 15) (2)In the form entry field, enter the contents before the change in the left column and the changed contents in the right column.
Overview of the contents of the notificationPlease summarize the changes in addition to the reasons for notification.
Guide mapPlease attach a map that shows the location of the establishment pertaining to the notification.
Floor plan of business sites
(Facility layout, elevation)
Indicate the location of the facility to be changed, and mark it with a color pen. Please fill in the facility number and facility name.
Drawings showing changesPlease show the drawings before and after the change of the items to be changed. Mark the target facilities and the parts to be changed with a color pen etc.
Explanatory materials for changesMark the parts to be changed with a color pen or the like. If necessary, please attach the materials before and after the change.
OthersPlease attach necessary instructions according to the content of the notification.

(4) Notification of change in name, etc.

Table
Subsidiary provisionsOrdinance Article 87, Paragraph 2
StyleChanges related to specific small-scale facilities registration form [Details Regulations No. 17 style] (outside site)
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineWithin 30 days from the date of change
Details of notificationChanges related to the following:
  • Name or name and in the case of Address or a corporation, the name of the representative
  • Name and location of a factory or business site

(5) Notification of abolition of small-scale fixed internal combustion engines and gas turbines

Table
Subsidiary provisionsOrdinance Article 88
StyleAbolition of specific small-scale facilities registration form [Details No. 18 style] (outside site)
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineWithin 30 days from the date of abolition
Details of notificationAbolition of small-scale fixed internal combustion engines and gas turbines
RemarksMake sure that all small fixed internal combustion engines and gas turbines installed at the business site are abolished, or some facilities are abolished. In the case of abolition of some facilities, please make it so that you can understand the model number or facility number of abolished facilities, and attach layout drawings of facilities as necessary.

5 Reporting Contacts and Inquiries

Please refer to "Information for Inquiry and Notification Desk".
In addition, depending on the content of the notification and consultation, it may take some time to confirm, so please come with plenty of time.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Atmosphere and Sound Environment Division, Green Environment Bureau Environmental Protection Department

Phone: 045-671-3843

Phone: 045-671-3843

Fax: 045-550-3923

E-Mail address [email protected]

Return to the previous page

Page ID: 156-977-059

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews