Procedures for asbestos discharge work (reports based on ordinances, etc.)

Last updated on October 3, 2024.

This section provides an overview of the notification procedures and guidance standards for performing asbestos emission work stipulated in the Ordinance on conservation, etc. of Yokohama City Living Environment (hereinafter referred to as the “Ordinance”) in Yokohama City. In addition, it is also regulated as specific dust discharge work based on the Air Pollution Control Law. Please check here for specific construction subject to notification.

→Go to the Air Pollution Control Law Regulations page

※On April 1, 2021, the Air Pollution Control Law was partially revised. (For details, please refer to the information page for law revision.)
※On October 1, 2021, the ordinance on the conservation, etc. of Yokohama City Living Environment was partially revised. (For details, go to the ordinance revision page.)
※From April 1, 2022, a report is required immediately when conducting a preliminary survey on construction of a certain scale or larger.
 (For details, go to the Asbestos General Information Portal Site (outside site))
※When performing construction such as demolition of buildings after October 2023, a preliminary survey by qualified persons is required.


Outline of regulations related to demolition, remodeling and repair work of buildings and other structures

  • Based on the Air Pollution Control Law, it is necessary to investigate in advance whether specific building materials are used in buildings to be dismantled, modified or repaired.
  • Those that fall under the work stipulated in the ordinance are subject to the regulations.
  • registration form must be submitted at least 7 days prior to the start of the work.
  • Please comply with work standards based on the Air Pollution Control Law and guidance standards based on ordinances.
  • Based on the regulations, it is mandatory to measure asbestos concentrations.
  • You must submit a completed registration form within 30 days after completing the work.
  • In the case of specific construction subject to notification stipulated by the Air Pollution Control Law, it is necessary to submit a notification procedure for work such as specific dust discharge based on the Air Pollution Control Law.
  • When performing construction that is not subject to the notification of the Air Pollution Control Law or the ordinance, please refer to the pamphlet "In dismantling, remodeling or repairing buildings, etc." and take necessary measures.

The work of dismantling, remodeling, or repairing buildings that use the following asbestos-containing building materials is subject to the regulations of the regulations.

  1. Sprayed asbestos
  2. Insulation materials containing asbestos, heat insulating materials and fire-resistant coating materials (excluding sprayed asbestos) Hereinafter referred to as "asbestos-containing heat insulating materials, etc.")
  3. Asbestos cloth
  4. Cement building materials containing asbestos (limited to molded plates) The following is referred to as "asbestos-containing cement building materials." Limited to those with a total area of 1,000 square meters or more of asbestos-containing cement building materials in the buildings, etc. subject to the work. )
  5. Finishing coating materials containing asbestos and base adjustment coating materials (hereinafter referred to as "asbestos-containing finishing coating materials, etc.")

Specific examples of sprayed asbestos and asbestos-containing heat insulating materials that are subject to these work and interpretation of terms that are not defined in the regulations are in accordance with the Air Pollution Control Law.

The procedure differs depending on the type of work, and it is as follows.

About procedures of the regulations
Asbestos-containing building materialsNotification of start of work

Completion of work
Notification

Asbestos in the atmosphere

Measurement of concentration

Guidance standards
Application

Air pollution
Prevention Law

Ordinance
Sprayed asbestos
Asbestos-containing heat insulating materials, etc.
Asbestos cloth

Asbestos-containing cement building materials
(Total usage area of 1,000 m2 or more)

Asbestos-containing finishing coating materials, etc.

(1) Preliminary surveys and their explanations

Based on Article 18-15 of the Air Pollution Control Law, the prime contractor or independent contractor of construction work (hereinafter referred to as "demolition work") involving the work of dismantling, remodeling or repairing buildings, etc. (Refer to a person who constructs himself without doing so) must investigate in advance whether or not specific building materials are used in the parts of the building, etc., and create and save records of the survey. In addition, at the construction site such as demolition, it is necessary to post the results of the preliminary survey so that it is easy for the local residents to see it, and to keep a copy of the record of the preliminary survey.
The prime contractor must explain the results of the preliminary survey to the ordering party in writing and keep a copy of the document.

Since the new use of asbestos has been banned since September 1, 2006, buildings, etc. that clearly indicate that construction work was started after September 1, 2006 in writing, etc. There is no need for a written survey or visual survey. For details, please refer to the Notification of the Director-General of the Water and Air Environment Bureau, Ministry of the Environment, No. 2011301, dated November 30, 2020, "Enforcement of Law Revision of Part of the Air Pollution Control Law (outside site)" Please check 2.

Obligations of prime contractors, etc.
Method of Preliminary Survey

(1) Written surveys of design documents and other documents and visual surveys
(2) (1)If it is not clear from the survey, the analysis will be conducted.
  (However, it is also possible to consider that asbestos is contained without analysis.)

Matters to be explained to the Ordering Party

(1) Matters related to Preliminary Survey
・ Results of Preliminary Survey
・ Date of completion of the preliminary survey
・ Method of Preliminary Survey
(2) Matters related to specific construction
・ Types of specified building materials in buildings, etc. subject to work such as specific dust discharge
  And the location and area of use
・ Type of work such as discharge of specified dust
・ Period of implementation of work such as specific dust discharge
・ Method of work such as discharge of specified dust
・ Overview of specific construction processes that clearly indicate the process of specific dust discharge, etc.
・ The name and location of the person in charge of the site of the prime contractor
・ The measures listed in each item of Article 18-19 of the Air Pollution Control Law concerning the method of specific dust discharge, etc.
  If it is not performed by the method specified in each item, the reason
・ Overview of buildings, etc. subject to work such as specific dust discharge, layout drawings, and nearby conditions
・ When a subcontractor carries out work such as the discharge of specified dust, the name of the subcontractor's site manager.
  And contact location

Time of explanationUntil the date of commencement of demolition work
(If work such as specific dust discharge is performed within 14 days from the start of the specified work subject to notification, up to 14 days prior to the start of the work.)

Preliminary Survey
Recorded items

(1) Name or name of the ordering party for demolition work and, in the case of Address and corporations, the name of the representative
(2) Location of demolition work
(3) Name and outline of demolition work
(4) Date of completion of the preliminary survey
(5) Method of Preliminary Survey
(6) Date of commencement of construction of installation of buildings, etc. related to demolition work
(7) Overview of buildings, etc. related to demolition work
(8) When demolition work corresponds to construction work involving remodeling or repair of buildings, etc.,
  Parts of buildings, etc. subject to the work
(9) When an analysis survey is conducted, the location where the survey was conducted, the name of the person who conducted the survey, and the name and
  Name of the institution or corporation to which it belongs
(10) Is each building material in the part of buildings, etc. pertaining to construction such as demolition correspond to specific building material?
   No, and its grounds

Records and Explanatory Documents
Copy retention period

Three years from the date of completion of demolition work

Preliminary Survey Results
Posting position

Locations that are easy to see from local residents, etc.

Preliminary Survey Results
Method of posting

A3 or more bulletin boards should be provided.
In addition, it is possible to use an electronic information processing organization such as digital signage, etc., and it is recommended that the contents of the notice be posted on the Internet be disclosed.

Preliminary Survey Results
Matters to be posted

(1) Results of Preliminary Survey
(2) The name or name of the prime contractor or independent contractor, and in the case of Address and corporations
  Name of the representative
(3) Date of completion of the preliminary survey
(4) Method of Preliminary Survey
(5) Types of specified building materials in buildings, etc.

The notice of the preliminary survey results can be output from the asbestos preliminary survey result report system, and the template of the notice can also be downloaded here. (To the download page of the template, etc.)

(2) Report on the results of the preliminary survey

Based on Article 18-15 of the Air Pollution Control Law, the prime contractor or independent builder of the demolition work must submit the preliminary survey results using an electronic system (asbestos preliminary survey result report system (outside site)) for construction of a certain scale or more. Must be reported. A report is also required if there is no asbestos.

Construction subject to reporting
Subject to constructionType of constructionScale to be reported
BuildingsDemolitionThe total floor area of the dismantled part is 80 m2 or more
Remodeling and RepairTotal contract price is 1,000,000 yen or more
Specific workpiecesDemolition, remodeling and repairTotal contract price is 1,000,000 yen or more

※(1) In the case where the same person undertakes demolition, remodeling, or repair work in two or more contracts, this shall be contracted under one contract.
   I will consider it.
※2 The total amount of the contract price refers to the amount of the entire work including the material cost, and does not include the cost of the preliminary survey, but includes the consumption tax.
   In addition, even if no contract has been made, the judgment will be made based on the appropriate contract price equivalent to the contractor's construction.
※3 Workpieces to be reported include reaction tanks, furnaces, boilers and pressure vessels, and plumbing equipment (water supply equipment, drainage equipment, ventilation equipment, etc.) installed in buildings.
   Excluding construction equipment such as heating facilities, cooling facilities, smoke exhaust equipment, etc.), incineration equipment, chimneys (excluding construction equipment such as smoke exhaust equipment installed in buildings),
   Storage facilities (excluding facilities for storing grains), power generation facilities (excluding solar power generation facilities and wind power generation facilities), substation facilities, distribution facilities, etc.
   Power transmission facilities (including cables), tunnel ceiling panels, platform upper house, sound insulation walls, lightweight embankment protection panels, underground iron roadside rest area
   It is the wall of the structural part, the ceiling board, and the enclosure of the elevators for sightseeing (excluding those that correspond to buildings). (Notification No. 77 of the Ministry of the Environment, October 7, 2020)

(3) Preliminary survey by qualified persons

When performing construction such as demolition of buildings after October 1, 2023, a preliminary survey by the following qualified persons was required. In order to obtain qualifications, it is necessary to attend and complete the courses conducted by the registered training institution. For details and the latest registered training institution information, please check the Asbestos General Information Portal Site (outside site).

  • Investigators of building materials containing specified buildings asbestos (specified investigators)
  • General building asbestos-containing building materials surveyor (general surveyor)
  • Investigators for building materials containing single-family houses (investigators for single-family houses)
  • Those who have been registered with the Japan Asbestos Survey and Diagnosis Association before September 30, 2023, and are still registered at the time of conducting the preliminary survey.

※Even if construction work such as demolition is started before October 1, 2023, it is necessary for qualified persons to perform a new preliminary survey after October 1, 2023.

In addition, when conducting an asbestos content analysis in a preliminary survey after October 1, 2023, it is necessary to request an analysis from a person who has taken an analysis survey course specified by the Minister of Health, Labor and Welfare based on the Asbestos Regulations and passed the completion examination (Notification No. 277 of the Ministry of Health, Labour and Welfare in 2020).

  • (Public Corporation) Certified analytical technicians of A rank, B rank or successful applicants of qualitative analysis in the "Asbestos Analysis Technology Evaluation Project" of the Japan Working Environment Measurement Association
  • (one company) Graduated from the Japan Environmental Measurement and Analysis Association’s “Asbestos Polarization Microscopy Practical Training (Building Materials Qualitative Analysis Expert Course)”
  • (one company) Those who have passed the Asbestos Qualitative Analysis Skill Test (for engineers) in building materials registered with the Japan Environmental Measurement and Analysis Association
  • (one company) "Asbestos Analysis Law Committee Certified JEMCA Instructor" registered with the Japan Environmental Measurement and Analysis Association
  • (one company) Those who have passed the "Analysis Technology to determine the presence and degree of asbestos content in building materials such as buildings and structures" certified by the Japan Textile Material Research Association's "Cross Check Project for Asbestos Analysis Accuracy"

In accordance with Article 92 of the Ordinance, the submission of work by registration form is required. Please submit the form to the counter with attached documents as the cover. Also, please unify the size of the registration form documents to A4 and fold large drawings to A4. If you have any questions, please contact Atmosphere and Sound Environment Division Green Environment Bureau, Yokohama in advance.
In addition, we may not be able to accept documents if there are incomplete documents, so please allow enough time for submission.

Start of asbestos discharge work registration form
StyleStart of asbestos discharge work registration form [Detailed Regulations No. 19 style] (outside site)
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineUp to 7 days prior to the start of work
(The work start date refers to the start date of curing work required for work such as removal.)
NotifierOrdering Party or Independent Contractor
Remarks

(1) Remove asbestos cloth or cement building materials containing asbestos of 1,000 m2 or more among the tasks regulated by the ordinance.
  Please submit it when you are working.
(2) Even if the work is regulated by ordinance, those that fall under the specified construction subject to the Air Pollution Control Law are subject to notification.
  Please note that it is necessary to carry out procedures such as specific dust discharge based on the Air Pollution Control Law.
  Yeah. In this case, the start of asbestos discharge work based on the ordinance shall be submitted in duplicate with the registration form.
  You don't need it.
(3) In principle, the submitter is the corporate representative of the ordering party, but the submitter of the construction is not the corporate representative.
  (Example: branch manager, branch president, factory manager, director, etc.) is delegated by a corporate representative.
  If you attach a document that can confirm that, the assignee can be the submitter.
  (Example: Power of Attorney, Certificate of All Matters, etc.)

[attached documents]
Depending on the content of the notification, it may be necessary in addition to the materials shown here, so please check at the counter at the time of notification. In addition, there is no need for a list of workers, safety and health management materials, and industrial waste materials.

attached documents
DocumentsRemarks
Overview of WorkPlease give an overview with about 1 sheet.
Local guide mapPlease make a drawing that shows the work site and its surroundings.
Layout of buildings on site
(Place of bulletin board installation)
Please specify the location of the buildings to be worked and the bulletin board (news on the results of the preliminary survey and work).
Bulletin board
(printed on A4 paper)

(1) Results of Preliminary Survey
(2) Announcement on Work
  Please indicate required items and the actual size.

Drawings that show the usage status of asbestos-containing building materials

Use floor plans and elevations (cross-sections if necessary) to provide asbestos-containing building materials.
Please specify where to use it.
I'd like you to know the main dimensions.
If you have a photo that shows the situation, please attach it.

Results of Preliminary Survey
(When an analysis is conducted)

If an analysis is conducted in the preliminary survey, the results of the survey shall be described.
Please.

Items that can confirm the deterioration status of asbestos-containing building materials
(In the case of containment or enclosure work)

According to photographs, etc., there is no deterioration of asbestos-containing building materials and good bonding with the base.
Please explain what you have.

Overall organization chartThe construction system should be understood, and the name of the ordering party and contact information (name of the person in charge, Phone number, etc.), the name of the measuring company, and the name of the industrial waste disposal company must be stated.
In addition, please attach a certificate that shows each emergency contact number and a certificate of working environment measurement organization of the measuring company.
Process schedulePlease describe the measurement plan of the work process and asbestos concentration.
Work and construction procedures
 Work flowchartIn addition to the work procedure, also indicate the timing of the measurement.
Construction methodPlease describe the work method specifically.
Curing plan diagramShow the curing plan using a floor plan, elevation, cross-section, etc.
I'd like you to know the main dimensions.
Measurement of asbestos concentration, etc.
 Measurement methodPlease also indicate the number of measurements for each measurement position.
Measurement location chartUse the floor plan, elevation, etc. to indicate the measurement position.
Specifications of equipment used, chemicals, etc.
 Vacuum cleanerPlease indicate the filter to be used and its dust collection efficiency.
Dust scattering inhibitor
Anti-shattering agent (solidification agent)
(Note) It is not necessary to attach a product safety data sheet (MSDS).

[Caution]
As a general rule, a new notification procedure is required to change important matters such as the scope of removal, so please suspend the work when it becomes clear and consult with Green Environment Bureau Atmosphere and Sound Environment Division, Yokohama immediately.

In addition, please contact the the Labor Standards Inspection Office and Resources and Waste Recycling Bureau Business Waste Management Division Administration Section, as it may be necessary to submit notifications based on the Occupational Safety and Health Regulations and the Asbestos Disorder Prevention Regulations, the Yokohama City Waste Reduction, Recycling and Proper Treatment of Waste Management and Public Cleansing Regulations.

Please observe the guidance standards. For details, please refer to the "Guidelines for Prevention of Air Pollution by Asbestos Emission Work (PDF: 131KB)".

About setting of bulletin board to disseminate work contents

The prime contractor or independent builder must provide a bulletin board with the following items in a position that is easily visible to nearby residents.

  • The name or name of the ordering party and the prime contractor or independent contractor of asbestos discharge work, and the name of the representative in Address and corporations
  • Date of notification and destination
  • Name and contact information of the site manager of the prime contractor or independent contractor of the asbestos discharge work
  • Period of asbestos discharge work
  • Method of asbestos discharge work

(Note) Regarding the form of the bulletin board
The notice of the preliminary survey results can be output from the asbestos preliminary survey result report system, and the template of the notice can be downloaded here. (To the download page of the template, etc.)
If required items is listed, you don't have to be this template.
Based on the guidance standards, the size of the bulletin board must be A3 size or more, posted at least 3 days before the work start date, and posted until the work is completed.

Emergency measures, etc.

Based on the guidance standards, the prime contractor or voluntary contractor shall immediately notify the mayor when asbestos is scattered or there is a risk of scattering due to asbestos discharge work. At the same time, it is necessary to take emergency measures to prevent asbestos scattering. In addition, it is necessary to report the situation of the situation concerned and summary of measures taken to the mayor promptly.
If this happens, please contact Green Environment Bureau Atmosphere and Sound Environment Division, Yokohama immediately.

Based on Article 93 of the Ordinance, the prime contractor or independent builder must measure the asbestos concentration in the atmosphere at the place where the work is performed, record the results, and save them. The measurement position, measurement frequency, etc. differ depending on the work method and work period. Also, if the total fiber concentration exceeds 1 fiber / L, check the asbestos fiber concentration with an electron microscope. Please contact Green Environment Bureau Atmosphere and Sound Environment Division, Yokohama based on the ordinance guidance standards. For details, please refer to the brochure "About asbestos removal work".

Based on Article 93-2 of the Ordinance, when the work is completed, the prime contractor must report the results to the ordering party in writing, make a record of the work, and keep a copy of this record and the report document there is.
The independent builder also needs to create and save records of the work.

Recording and Reporting of Operations

Matters to be reported to the Ordering Party

(1) Date of completion of work
(2) Overview of Work Implementation
(3) Applicable to the name of the person who has confirmed that the removal has been completed and the person who has necessary knowledge.
  Copy of documents proving to do so
(4) Results of measurement under the provisions of Article 93 of the Ordinance
(5) Process schedule
(6) A series of situations in the work
(7) Shows the status of sampling in measurement pursuant to Article 93 of the Ordinance
(8) Differences between work planning and actual work
(9) Other matters deemed necessary by the mayor

Date of reportingUntil the date of notification of completion
Recorded items

(1) The name and contact location of the person in charge of the site of the prime contractor or the independent contractor of the specified construction
(2) Name of the site manager of the subcontractor when the subcontractor carries out work such as the discharge of specified dust.
  And contact location
(3) Name or name of the ordering party for the specified construction and the name of the representative in the case of Address and a corporation
(4) Location of specified construction
(5) Type of work such as discharge of specified dust
(6) Period of work
(7) Operations
・Date of confirmation that removal, etc. was completed, results of confirmation
 If measures are taken, including the contents) and the name of the person who made the confirmation
・In the case of negative pressure isolation curing, confirm that the dust collection and exhaust system are operating normally, and work sites and facilities.
 Confirm that all rooms are kept at negative pressure, and discharge of asbestos into the atmosphere before quarantine is released.
 Date of confirmation that there is no risk, result of confirmation (if measures are taken, the details shall be provided.)
 Including) and the name of the person who made the confirmation
(8) A person who has confirmed that the removal, etc. has been completed corresponds to a person who has the necessary knowledge.
  A copy of the documents to be certified

Copy of record and report
Storage period

Three years from the date of completion of demolition work

In accordance with Article 94 of the Ordinance, registration form must submit the completion of work (reported by the prime contractor). Please submit the following form to the counter with attached documents. Also, please unify the size of the registration form documents to A4 and fold large drawings to A4. If you have any questions, please contact Atmosphere and Sound Environment Division Green Environment Bureau, Yokohama in advance.
In addition, we may not be able to accept documents if there are incomplete documents, so please allow enough time for submission.

About notification at the time of completion
StyleCompleted asbestos discharge work registration form [Detailed Regulations No. 20 style] (outside site)
Number of copies submitted2 copies of primary and secondary copies
Submission deadlineWithin 30 days after completion of work
NotifierThe same submitter as the submitter at the start

[attached documents]
Depending on the content of the notification, it may be necessary in addition to the materials shown here, so please check at the counter at the time of notification.
In addition, there is no need for a list of workers, safety and health management materials, and industrial waste materials.

attached documents
DocumentsRemarks
Actual schedule

The actual work process is added to the process schedule attached to the notification of the start of work.
Make it so that you can see the difference between the plan and the actual work.

Measurement results of asbestos concentration, etc.

Report from the measuring company (measurement result, date and time of measurement, measurement point, measurement method)
Please attach a copy of it. In addition, we recorded the status of sample collection at work sites.
Please attach a photo too.

Photos of the work detailsBefore work, curing work, removal work, etc., shatter prevention measures after removal, and curing removal should be attached.
Please be sure to attach a bulletin board that shows the installation status and the contents of the bulletin board.
Explanatory materials for changesIf there is any change in the content of the notification of the start of work, please attach the explanatory materials.
[Caution]
As a general rule, a new notification procedure is required to change important matters such as the scope of removal, so please suspend the work when it becomes clear and consult with Green Environment Bureau Atmosphere and Sound Environment Division, Yokohama immediately.

Since the work content of the construction is largely dependent on the order from the ordering party, the ordering party is required to give consideration to the construction method, construction period, cost, etc. so that the work can be performed appropriately. In addition, it is required that the prime contractor or subcontractor take care of all or part of the construction to another person.

Ordinance
(Consideration of Ordering Party, etc.)
Article 95 The ordering party of asbestos discharge work shall notify the main contractor of the asbestos discharge work with the asbestos discharge work regarding the construction method, construction period, construction cost, and other matters related to the contract for the asbestos discharge work. Care must be taken not to comply with the guidance standards of Article 90 and to provide conditions that may prevent the prime contractor from performing measurements pursuant to Article 93.
(2) The provisions of the preceding paragraph shall apply mutatis mutandis to the case where a prime contractor or subcontractor of asbestos discharge work contracts all or part of the asbestos discharge work to another person.

As we distribute brochure which summarized summary such as notification procedure and instruction standard when we perform asbestos discharge work, please confirm beforehand when report.
This pamphlet is distributed free of charge at this section. In addition, we can download electronic version from "brochure" about asbestos removal construction ".

Please refer to "Information for Inquiry and Notification Desk".
In addition, depending on the content of the notification and consultation, it may take some time to confirm, so please come with plenty of time.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Atmosphere and Sound Environment Division, Green Environment Bureau Environmental Protection Department

Phone: 045-671-3843

Phone: 045-671-3843

Fax: 045-550-3923

E-Mail address [email protected]