Tsurumi Public Works Office (refurbished)

Tsurumi Public Works Office Renovation Project (acquisition of ZEB Ready)

Last updated on April 7, 2025.

Overview of Construction

Overview of Facilities
Name of the facility Tsurumi Public Works Office

Location

3-28-1, Tsurumichuo, Tsurumi-ku
Building area

553.31㎡

Total floor area 1,465.71㎡
Completed construction 1998
Building structure

RC, 2 stories above ground

Facility use Office

Main construction details
Job type Contents
Architecture High insulation of window sashes by replacing single-plate glass with Low-E multi-layer glass with Attachment.

Protection of existing asphalt waterproofing The roof is highly insulated by applying ground treatment to concrete and waterproofing external insulation sheet.

Electricity Use LED lighting in all rooms
Machinery

By reviewing the air-conditioning load capacity, we changed from the central heat source method to the individual heat source method, and adopted a high-efficiency packaged air conditioner.


※The construction is mainly based on the renewal of existing parts and equipment for the extension of life, and does not include energy creation (photovoltaic power generation, etc.).

Certification

We obtained ZEB Ready certification on April 23, 2024.
BEI value: 0.48 (52% reduction in energy compared to conventional buildings)
Authentication mark

Start of construction

Construction Information
 ArchitectureElectricityMachinery
Name of construction

Tsurumi Public Works Office rooftop waterproofing repair and other construction work

Renewal of lighting equipment in Tsurumi Public Works OfficeRenovation of air conditioning equipment in Tsurumi Public Works Office
ContractorKeio Kensetsu Yokohama Co., Ltd.Toho Electric Construction Co., Ltd.Marushin Kogyosho Co., Ltd.
Construction periodFrom Wednesday, August 21, 2024 to Friday, February 28, 2025

※Construction orders from each contractor are placed by the Yokohama City Building conservation Corporation.

State of construction

Photo of Public Works Office Tsurumi (under construction)
Tsurumi Public Works Office (under construction)

Introduction of rooftop waterproofing renovation work (building)

Protection of existing asphalt waterproof protection This is the work of applying ground treatment to concrete and waterproofing external insulation sheet. The area where the living room is located downstairs is insulated to suppress the heat load from the outside. The cross section of the external insulation sheet waterproofing is as shown in the photo of the external insulation sheet waterproofing (section), and is mainly divided into layers of insulation, reinforcement boards, and waterproof sheets. In areas where there is no living room downstairs, heat insulation is not performed, and only waterproof sheets are used.

Reinforcing boards are installed with open joints as shown in the fixed photo of the reinforcement boards and insulation materials to prevent them from sticking up. In addition, fixing the insulation and reinforcement plate with the fixed metal fittings used in the photo, and covering the waterproof sheet from above, it looks like a photo of external insulation sheet waterproofing.

Introduction of construction details

1 Rooftop waterproofing repair (building)

Please refer to "Construction of Construction" for details.

2 Window insulation renovation (building)

By replacing single-plate glass used in windows with low-E double-glazing glass with Attachment, the window sash has been highly insulated.

Double glass
Low-E multi-layer glass with Attachment

3 Use of LED lighting (electricity)

By using high-efficiency equipment, all rooms and lighting have been converted to LEDs to reduce heat inside the room.

4 Removal of central heat source equipment (machine)

Absorptive cold water generator, cooling tower, cold water pump, cooling water pump, expansion tank, pressurized water supply pump unit for air conditioning (with water receiving tank) were installed by the central heat source method, but in this renovation, it was removed because it was changed to an individual air conditioning system.

5 Installation of package type air conditioners

Since the central heat source equipment was removed, package-type air conditioners were installed in each room. Outdoor units are installed around the building on the first floor, on the second floor balcony and on the rooftop.

Indoor units

Outdoor units

Schedule

  • Review of ZEB renovation design for FY2022
  • 2023 Design Operations
  • Acquired ZEB Ready certification for FY2024 and started construction

Press release materials

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Housing and Architecture Bureau Public Architecture Department conservation Promotion Division

Phone: 045-671-2982

Phone: 045-671-2982