Building permit based on Article 53 of the City Planning Act

Last updated on February 21, 2025.

Purpose

When we build building in area of city planning facility where city planning was decided or enforcement area of city area development business to secure smooth enforcement of future business, it is necessary to receive permission of the mayor of Yokohama .

Acts subject to permission

Construction of buildings in the area of city planning facilities or in the enforcement area of urban development projects (* 1).

The construction of a workpiece is not an act subject to permission.

※1: Click here for permission in the enforcement area of urban development projects (land readjustment projects, etc.).

Permit criteria

The building meets all of the requirements listed below and can be easily relocated or retired.

  1. Notification such as business approval (Article 62, Paragraph 1 of the City Planning Act) has not been made (* 2) It must be performed in the area of city planning facilities.
  2. The number of floors is 3 or less, the height is 12m or less, and there is no basement.
  3. The main structural part (the main structural part specified in Article 2, Item 5 of the Building Standards Act) must be wooden, steel, concrete block, or other similar structures.

In addition, as there is relaxation about construction such as general road or digging garage, please confirm summary and operation standard for the details.
In addition, please refer to the following documents as there is a separate restriction on building permits in residential facilities of one complex.

[Housing facilities in a complex]

※2: If a notification of business approval or approval (Article 62, Paragraph 1 of the City Planning Act) is made, the permission provisions of Article 53 do not apply. Article 65 Please refer to the contents of permission.

How to submit documents

At the City Planning Division window, we accept documents submission. We also accept applications by mail.
If you would like to apply by mail, please check required documents and call us in advance.
Contact: City of Yokohama, Housing and Architecture Bureau City Planning Division Instructor
Phone: 045-671-3510

Permit procedure period

It will take about 7 business days after receiving the documents.

In the case of areas such as city planning roads under business other than the City Planning Act (* 3), it takes about 2-3 weeks to refer to the company.
※3: As a general rule, we cannot build a building in the business area, but we may give permission when we can confirm that there is no obstacle to the enforcement of the business. For example, building activities at the top of a tunnel (underground) structure are applicable. When we build building in business place, I would like discussion with business bureau beforehand.

Inquiries and permission application

Permission in the area of city planning facilities (roads, parks, rivers, housing facilities in complexes, etc.) (excluding the enforcement area of urban development projects)
In chargeTELAddressPostal code
Housing and Architecture Bureau City Planning Division Instructor045-671-351010 City Hall 25F, 6-50 Honcho, Naka-ku, Yokohama City231-0005

Please confirm this for reference of permission in area of city area development business (land readjustment business).


required documents

Except for the letter pack, two or three copies (* 4) are required for permission applications and various attached documents.

  1. Permit application (seal is not required)
  2. Power of Attorney (when delegated). seal is not required. ※5
  3. Guide map (with a scale of 1/2500 or more that describes the direction, site location, public facilities around the site, etc.)
  4. Layout map (with a scale of 1/500 or more that describes the location, direction, site boundary, relationship between site and road)
  5. Floor plan (with a scale of 1/200 or more)
  6. Elevations (with a scale of 1/200 or more. Two or more elevations are required.
  7. Cross-section (with a scale of 1/200 or more). Two or more cross-sections are required.
  8. Browse diagram of each floor (unnecessary for wooden structures) ※6
  9. Aximum diagram (not required for wooden structures) ※6
  10. Basic drawing (unnecessary for wooden structures) ※6
  11. Manufacturer's certificate (unnecessary for wooden construction) ※6
  12. Letter pack for reply ※7

※4: In the case of permission in the area of undeveloped city planning roads and urban development projects, the required number of copies is two. In the case of city planning roads under business, city planning parks, etc., three copies are required.

※5: There is no designation in the form, but please state in the delegation item "All thing about permission application and change of Article 53 of the City Planning Act".

※6: If you attach a “Mufacturer Certificate for Model Members, etc.”, you do not need a “Floodwork Map”, “Floodwork Map”, and “Flood Map”.

※7: Reply letter packs can be accepted in either red (plus) or blue (light). Please fill in the "Postal Code" and "Delivery Address" fields and submit it.

Application Form, Attachments, etc.

Application Form, Attachments, etc.
Application typeForm (PDF version)Form (Word version)
Article 53 Permit ApplicationArticle 53 Permission Application (PDF: 208KB)Article 53 Permission Application (Word: 28KB)

Change registration form

(When minor changes are made to those that have already obtained the permission of Article 53)

※Please submit after consultation with the person in charge.
Information flyer (PDF: 224KB)

Change registration form (PDF: 114KB)Change registration form (Word: 22KB)

Notification of withdrawal
(When applying for permission under Article 53 and withdrawing the application before notification of permission)

Notification of withdrawal (PDF: 102KB)Notification of withdrawal (word: 19KB)

Notification of cancellation
(When canceling a license that has already obtained Article 53 permission)

Notice of cancellation (PDF: 103KB)Notice of cancellation (word: 21KB)

Succession of position registration form
(When succeeding the status of a person who has already obtained the permission of Article 53)

Succession of position registration form (PDF: 102KB)Succession of position registration form (word: 21KB)

Article 53 Exceptions to Permission (Deemed Rules)

Buildings corresponding to any of the following are considered to have Article 53 permission (Handling Guidelines Article 4 on Building Permits in the area of city planning facilities) (PDF: 369KB), Article 53 permission application procedure Is not required (excluding housing facilities in one complex).

1.In building built in area of city planning facility which maintenance was completed by city planning business, the mayor discusses with company such as the city planning business or manager (* 8) of the city planning facility concerned, Those who admit that there is no problem in the maintenance and management of the city planning facility
2.Gates or fences that have wooden, steel, concrete block, or similar structures.
3.Building equipment

※8: About manager of maintained city planning facilities such as underground structures, please confirm in "about discussion with facility managers of maintained city planning facilities such as underground structures" (PDF: 218KB).

Outlines and operational standards

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Planning Division, Housing and Architecture Bureau Planning Department

Phone: 045-671-3510

Phone: 045-671-3510

Fax: 045-550-4913

E-Mail address [email protected]

Return to the previous page