Yokohama City Hall Construction Times

Last updated on June 26, 2020.

We will deliver the design and plan outline of the new city hall, the progress of the construction, and the construction method to everyone once every three months as the "Yokohama City Hall Construction Times".

Final issue (PDF: 1,960KB)
(April 2020)
The building was completed at the end of January~
 〇 Completion report
   Office (high-rise)
   Meeting Room and Committee Room (Middle Division)
   Atrium (low-rise part)
   Citizen-use facilities (low-rise areas)
   Exterior remain Exhibition
   Bashamichi Station, Sakura Mirai Bridge Connection 

No. 10 (PDF: 2,239KB)
(December 2019)
~ Appearance, close to completion! ~
 〇 Points of the Plan
   Planning of exterior and parliamentary functions
 〇 On-site report
   Construction status of planting, exterior, low-rise, and atrium
 〇 History remain excavated on the site of the new city hall

No. 9 (PDF: 5,673KB)
(September 2019)
-The atrium, which is an atrium space with a height of about 20m, has appeared ~
 〇 Plan for Atrium
 〇 I know a little bit of architecture
   Method of construction of atrium
 〇 On-site report
   Construction status of administrative buildings, atrium, and assembly buildings
 〇 We received electricity in August

No. 8 (PDF: 2,154KB)
(June 2019)
-The installation of the outer wall of the administrative building has been completed~
 〇 Points of the Plan
   Planning for the high floor of the administrative building
 〇 I know a little bit of architecture
   Elevators that support intermediate-level seismic isolation
 〇 On-site report
   Atrium steel frame construction, interior construction of administrative buildings, floor construction of parliament, etc.
 〇 I made the upper building

No. 7 (PDF: 2,006KB)
(February 2019)
-The exterior construction has progressed, and the whole picture of the building has begun to appear! ~
 〇 Points of the Plan
   Utilization of BIM
 〇 Demolition of large tower cranes

 〇 On-site report
   Steel frame construction, exterior wall construction, equipment plumbing work, foundation work, etc.
 〇 "Outside Kannai OPEN!" Participation in

No. 6 (PDF: 5,511KB)
(December 2018)
~ Ground steel frames and exteriors are being built up smoothly! ~
 〇 Points of the Plan
   Environmental Technology (Fuel Cell)
 〇 Let's know a little about architecture!
   How do you build a steel frame straight?
 〇 On-site report
   Status of steel frame construction and fire-resistant coating work
 〇 Interview with a temporary enclosure art creator
 〇 Implementation of children's adventure

No. 5 (PDF: 2,127KB)
(August 2018)
The ground steel frame is being built up smoothly! ~
 〇 Points of the Plan
   Environmental Technology
   ・Air conditioning system in the office
   ・DHC (Regional Heating and Cooling)
   ・Underground heat air conditioning
 〇 On-site report
   How do you get up with a tawork lane?
   Site construction status
 〇 Let's know a little!
   Holding a symposium
   Introduction of temporary enclosure art

No. 4 (PDF: 2,715KB)
(April 2018)
We are working on ground construction and underground construction at the same time! ~
 〇 Points of the Plan
   BCP measures
   ・Japan's highest rank seismic performance - adopt hybrid seismic isolation -
 〇 On-site report
   Construction of steel frames and seismic isolation layers on the ground
   Underground excavation work, steel frame work, floor work
 〇 Let's know a little!
   Design supervision of the new city hall

No. 3 (PDF: 1,634KB)
(February 2018)
-To a new government building that plays a central role in crisis management that can deal with various crises-
 〇 Points of the Plan
   BCP measures
   ・Equipment measures
   ・Introduction of earthquake and structure monitoring systems
 〇 On-site report
  Flow of steel frame construction and upfront floor construction on the first floor
 〇 Let's know a little about architecture!
  What is the difference?

No. 2 (PDF: 3,388KB)
(November 2017)
-We are proceeding with pile construction that serves as the foundation of the building~
 〇 Points of the Plan
  Concept of landscape formation
  High-rise exterior plan
 〇 On-site report
  Flow of construction of place-mounted piles and construction pillars
 〇 Let's know a little about architecture!
  What is the difference?

No. 1 (PDF: 1,009KB)
(August 2017)
We started construction with the aim of completion in 2020! ~
 〇 Points of the Plan
  Where is the new city hall planned?
  What kind of building is the new city hall?
 〇 On-site report
  The groundbreaking ceremony was held!
 〇 Let's know a little about architecture!
  The construction period is shortened by the reverse hitting (Sakauchi) method!

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

General Affairs Bureau General Affairs Department Administration Division

Phone: 045-671-2082

Phone: 045-671-2082