Menu

Close

The text is from here.

Results of underground electric wires

Last updated on July 24, 2024.

We will introduce the results of underground electric wires implemented in Yokohama City by method.
In addition, we introduce the designation situation of maintenance road with maintenance of electric wire joint ditch.

Results by underground electric wire method
Plan Electric wire joint groove Single grounding※ Cab system Communal groove Total
1st term (from FY1986 to FY1990) 0 30.8 5.4 0 36.2
2nd term (from 1991 to 1994) 0 31.2 2.8 2.6 36.6
Third term (from fiscal 1995 to fiscal 1998) 1.8 42.1 2.3 3.8 50.0
New electric wires (from fiscal 1999 to fiscal 2003) 28.1 27.6 0 1.4 57.1
No utility poles (from fiscal 2004 to fiscal 2008) 7.9 2.6 0 0 10.5
No utility poles (from FY2009 to FY2013) 9.1 0.2 0 0 9.3
No utility poles (FY2014) 0.3 0 0 0 0.3
No utility poles (FY2015) 0.5 0 0 0 0.5
No utility poles (FY2016) 0.2 0 0 0 0.2
No utility poles (FY2017) 0.46 0 0 0 0.46
No utility poles (FY2018)

0.38

0 0 0 0.38
No utility poles (FY2019/FY2019) 0.90 0 0 0 0.90
No utility poles (FY2020) 1.50 0 0 0

1.50

No utility poles (FY2021) 0.21 0 0 0 0.21
No utility poles (FY2022) 0.55 0 0 0 0.55
No utility poles (FY2023) 1.42 0 0 0 1.42
Total 53.32 134.5 10.5 7.8 206.12

Unit: (as of March 31, 2024)
※“Single undergrounding” includes the track record of developing multi-line communal housing ditches and local government pipelines (a method in which local governments lay pipeline facilities).

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Road and Highway Bureau Road Department Management Section

Phone: 045-671-2770

Phone: 045-671-2770

Fax: 045-651-5443

E-Mail address [email protected]

Return to the previous page

Page ID: 325-956-349

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews