- Yokohama-shi Top Page
- Living, procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental assessment
- Business in Yokohama City
- 66.Procedures for Environmental Impact Assessment of Sotetsu and JR Direct Lines
- 66.Post-survey results report on the Sotetsu / JR Direct Line (in service / presence)
The text is from here.
66.Post-survey results report on the Sotetsu / JR Direct Line (in service / presence)
Last updated on February 25, 2025.
Post-Survey Results Report (in service / presence)
Please see the following PDF file for the Sotetsu / JR Direct Line post-survey report (in service / presence).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Main part
Ex-post survey report of Sotetsu / JR Direct Line (in service / presence) (PDF: 20,695KB)
- Chapter 1 Business Plan
- 1.1 Name of business, etc.
- 1.2 Type and name of the target business
- 1.3 Contents of the target business
- 1.4 Implementation status of the target projects
- 1.5 Name of the conductor and trustee of the post-survey, Address
- Chapter 2 Items of post-survey on target projects
- Chapter 3 Results of Post-Survey
- 3.1 Progress of Target Business
- 3.2 Overview of Post-Survey Results
- 3.3 Results of ex-post investigation
- 3.3.1 Noise
- 3.3.2 Vibration
- 3.3.3 Waste and generated soil
- 3.3.4 Water elephants (underground water level and flow rate of spring water)
- Chapter 4 Summary and Discussions
Remarks
- The map used in the PDF file is a copy of the electronic topographic map 25000 issued by the Geographical Survey Institute with the approval of the Director. (Approved by the Geospatial Information Authority of Japan based on the Survey Method (Reproduction) R6JHf237)
- If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.
Status of Procedures
For the status of the procedure of this project, please refer to “66. Sotetsu / JR Direct Line Environmental Impact Assessment Procedure”.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Green Environment Bureau Environmental Conservation Department
Phone: 045-671-2495
Phone: 045-671-2495
Fax: 045-663-7831
E-Mail address [email protected]
Page ID: 355-333-822