71.Post-survey results report on the Sotetsu and Tokyu Direct Lines (after service)

Last updated on February 25, 2025.

Post-survey results report (after operation)

Please see the following PDF file for the Sotetsu / Tokyu Direct Line post-survey result report (after service).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.

Main part

  • Chapter 1 Plans for Target Businesses
    • 1.1 Name of business operator, name of representative and location of main office
    • 1.2 Name of the target business
    • 1.3 Type and scale of the target business
    • 1.4 Target project implementation area
    • 1.5 Overview of the Target Business
    • 1.6 The conductor and trustee of the post-survey
  • Chapter 2 Results of Post-Survey
    • 2.1 Items and methods of post-survey described in the post-survey plan
    • 2.2 Overview of the results of the post-survey
    • 2.3 Results of ex-post investigation
      • 2.3.1 Noise
      • 2.3.2 Vibration
      • 2.3.3 Land subsidence
      • 2.3.4 Water level of groundwater
      • 2.3.5 General waste and industrial waste associated with the operation of station buildings
    • 2.4 Consideration of post-survey results
      • 2.4.1 Noise
      • 2.4.2 Vibration
      • 2.4.3 Land subsidence
      • 2.4.4 Water level of groundwater
      • 2.4.5 General waste and industrial waste associated with the operation of station buildings
    • 2.5 If new measures are taken to protect the environment, the results of such measures, predictions, evaluations, or results of ex-post investigation
  • Chapter 3 Response to Opinions submitted in the Environmental Impact Assessment Procedure
  • Chapter 4 Summary and Discussions
    • 4.1 Ex-post survey items
    • 4.2 Results of post-investigation by item
      • 4.2.1 Noise
      • 4.2.2 Vibration
      • 4.2.3 Land subsidence
      • 4.2.4 Water level of groundwater
      • 4.2.5 Waste, etc. (general waste and industrial waste associated with the operation of station buildings)

Remarks

  • The map used in the PDF file is a copy of the electronic topographic map 25000 issued by the Geographical Survey Institute with the approval of the Director. (Approved by the Geospatial Information Authority of Japan based on the Survey Method (Reproduction) R6JHf238)
  • If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.

Status of Procedures

For the status of the procedure of this project, please refer to “71. Sotetsu / Tokyu Direct Line Environmental Impact Assessment Procedure”.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Environmental Impact Assessment Division, Green Environment Bureau Environmental Conservation Department

Phone: 045-671-2495

Phone: 045-671-2495

Fax: 045-663-7831

E-Mail address [email protected]

Return to the previous page

Page ID: 515-325-226

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews