Introduction of sewerage office construction
Last updated on December 8, 2021.
About each construction
Shield work
This method is often used for relatively large and long tunnel construction.
The tunnel is excavated while digging a steel excavator called a shield machine into the ground, and concrete and steel blocks called segments are assembled behind them to create tunnel walls. If this is the case, the surface will be uneven, so the inside may be rounded with concrete. A shaft is required to carry in shield machines and carry out earth and sand.
Shield machine (Rotate the tip (blue part) to dig the soil.) | After segment assembly |
---|---|
Promotion work
Excavation is made by a digging machine dug from the starting shaft, a propulsion pipe is connected behind the digging machine, and the propulsion pipe is pushed into the ground with a jack to build a pipeline.
A shaft is required to carry in digging machines and carry out earth and sand.
Construction of shafts (The soil is soiled with a liner plate, etc. while excavating the soil.) | Drilling machine |
---|---|
Drilling status (Push the pipe into the ground with a jack.) | Status of promotion of jurisdiction |
Rainwater regulating pond construction (Kanagawa treatment zone Tachibana hill multipurpose rainwater regulating pond construction (Part 9)))
Construction of rainwater regulating ponds will be carried out to temporarily store rainwater and reduce flood damage.
After excavating earth and sand, installing a concrete box-shaped structure (precast block), backfilling is performed.
Surveying | Full view | Excavation work |
---|---|---|
Situation of foundation concrete | Completion of foundation concrete casting | Precast block installation status |
Complete precast block installation | Completed construction of end wall | Inside the reservoir |
Construction of water treatment facilities
A large-scale concrete structure will be built to build a facility for treating sewage.
Many types of work are often required, such as earth retaining work, excavation work, reinforcing work, formwork work, and concrete work, and the construction period is long.
Even after the structure is completed, equipment work to install machines for treating sewage and construction work to build buildings on the ground (management buildings, etc.) will be performed.
Squeezing (The steel pipe, which forms the basis of the structure, is inserted.) | Earth retaining work (Yaita work) (Long iron plates are embedded in the ground continuously.) |
---|---|
![]() | ![]() |
Earth retaining work (It looks like a wall after hitting the sheet pile.) | Excavation work |
![]() | ![]() |
Reinforcement | Concrete |
![]() | ![]() |
Anticorrosion work
In a closed sewage treatment facility, hydrogen sulfide is generated, and concrete in the facility is gradually corroded.
In order to prevent corrosion, the concrete surface is coated with acid-resistant materials.
In existing facilities where corrosion has already progressed, the corroded concrete is cut off, repaired with mortar, and then coated with anticorrosion materials.
Dredging | Lower cleaning | Removal of degraded parts |
---|---|---|
![]() | ![]() | ![]() |
Pre-section repair primer application | Anticorrosion coating (section repair) | Anti-corrosion coating (primer application before base adjustment) |
![]() | ![]() | ![]() |
Anticorrosion coating (ground adjustment) | Anti-corrosion coating (overpainting) | Anti-corrosion coating (top) |
![]() | ![]() | ![]() |
Rehabilitation of pipes
We make new pipe in old sewer pipe and plan update of pipe and earthquake resistance.
It may be carried out at night when the amount of sewage is low.
Pipe manufacturing (A new material is wrapped around the surface of the old pipe.) | Support (Don't deform the new tube when injecting backfills. Materials to be reinforced are installed.) |
---|---|
Backfilling work (Mortar is injected between the old pipe and the surface components.) | Completed |
Inquiries to this page
Sewerage and Rivers Bureau Sewer Pipeline Sewerage Office
Phone: 045-337-3010
Phone: 045-337-3010
Fax: 045-337-3013
E-Mail address [email protected]
Page ID: 835-173-184