Introduction of sewerage office construction

Last updated on December 8, 2021.

About each construction

Shield work

This method is often used for relatively large and long tunnel construction.
The tunnel is excavated while digging a steel excavator called a shield machine into the ground, and concrete and steel blocks called segments are assembled behind them to create tunnel walls. If this is the case, the surface will be uneven, so the inside may be rounded with concrete. A shaft is required to carry in shield machines and carry out earth and sand.

Reference photo
Shield machine
(Rotate the tip (blue part) to dig the soil.)

After segment assembly
(Primary cover work)

Shield machine


1



Promotion work

Excavation is made by a digging machine dug from the starting shaft, a propulsion pipe is connected behind the digging machine, and the propulsion pipe is pushed into the ground with a jack to build a pipeline.
A shaft is required to carry in digging machines and carry out earth and sand.

Reference photo
Construction of shafts
(The soil is soiled with a liner plate, etc. while excavating the soil.)

Drilling machine

Propulsion machines


2


Drilling status
(Push the pipe into the ground with a jack.)
Status of promotion of jurisdiction

Promotion status


Status of promotion of jurisdiction



Rainwater regulating pond construction (Kanagawa treatment zone Tachibana hill multipurpose rainwater regulating pond construction (Part 9)))

Construction of rainwater regulating ponds will be carried out to temporarily store rainwater and reduce flood damage​.
After excavating earth and sand, installing a concrete box-shaped structure (precast block), backfilling is performed.

Reference photo
SurveyingFull viewExcavation work

I'm doing surveying using a drone.

This is a photo of the whole view.

Excavation work

Situation of foundation concreteCompletion of foundation concrete castingPrecast block installation status

Situation of foundation concrete

Completion of foundation concrete casting

Precast block installation status

Complete precast block installationCompleted construction of end wallInside the reservoir

Complete precast block installation

Completed construction of end wall

Inside the reservoir


Construction of water treatment facilities

A large-scale concrete structure will be built to build a facility for treating sewage.
Many types of work are often required, such as earth retaining work, excavation work, reinforcing work, formwork work, and concrete work, and the construction period is long.
Even after the structure is completed, equipment work to install machines for treating sewage and construction work to build buildings on the ground (management buildings, etc.) will be performed.

Reference photo
Squeezing
(The steel pipe, which forms the basis of the structure, is inserted.)
Earth retaining work (Yaita work)
(Long iron plates are embedded in the ground continuously.)
SqueezingSteel sheet pile driving
Earth retaining work
(It looks like a wall after hitting the sheet pile.)
Excavation work
After casting steel sheet pileExcavation work
ReinforcementConcrete
ReinforcementConcrete

Anticorrosion work

In a closed sewage treatment facility, hydrogen sulfide is generated, and concrete in the facility is gradually corroded.
In order to prevent corrosion, the concrete surface is coated with acid-resistant materials.
In existing facilities where corrosion has already progressed, the corroded concrete is cut off, repaired with mortar, and then coated with anticorrosion materials.

Reference photo
DredgingLower cleaningRemoval of degraded parts
DredgingLower cleaningRemoval of degraded parts
Pre-section repair primer applicationAnticorrosion coating (section repair)Anti-corrosion coating (primer application before base adjustment)
Pre-section repair primer applicationCross-section repairPrimer application before base adjustment
Anticorrosion coating (ground adjustment)Anti-corrosion coating (overpainting)Anti-corrosion coating (top)
Base adjustmentOvercoating

Rehabilitation of pipes

We make new pipe in old sewer pipe and plan update of pipe and earthquake resistance.
It may be carried out at night when the amount of sewage is low.

Reference Materials
Pipe manufacturing
(A new material is wrapped around the surface of the old pipe.)
Support
(Don't deform the new tube when injecting backfills.
Materials to be reinforced are installed.)

Pipe manufacturing


Support


Backfilling work
(Mortar is injected between the old pipe and the surface components.)
Completed

Backfilling work


Completed


Inquiries to this page

Sewerage and Rivers Bureau Sewer Pipeline Sewerage Office

Phone: 045-337-3010

Phone: 045-337-3010

Fax: 045-337-3013

E-Mail address [email protected]

Return to the previous page

Page ID: 835-173-184

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews