Landscape planning and urban landscape consultation district in Kannai-District

Last updated on December 27, 2024.

  In order to make the landscape of Kannai-District, which has been developed as the center of Yokohama since its opening, Yokohama City has established the landscape rules of Kannai-District as a "landscape plan" based on the Landscape Act (outside site) and the ordinance on the creation of attractive cityscapes in Yokohama (hereinafter referred to as the "landscape ordinance"). When we perform predetermined act in area, "report of scenery plan" based on scenery law and "city scenery consultation" based on scenery regulations are necessary beforehand.


Request about procedure of scenery plan, cityscape discussion district

About revision of scenery plan of Kannai-District and cityscape consultation district

In order to implement a system that reflects the content of the "Guidelines for the Formation of Nightscapes in Central City of Yokohama" formulated in July 2022, the Yokohama City Landscape Plan and the Kannai-District Cityscape Consultation Area were partially revised.

1 Target area


Target area

2 Landscape plan

2-1 Body and Plan

2-2 Acts subject to notification

  1. New construction, extension, renovation, relocation of buildings (excluding extensions and renovations without change in appearance)
  2. Repairs, remodeling, or color changes that will change the appearance of the building, whose total found area of the part to be changed is 10 m2 or more
  3. New construction, extension, renovation, relocation of structures (* 1) (excluding renovations without a change in appearance)
  4. Repairs, remodeling, or color changes that change the appearance of the work (* 1), whose total found area of the part to be changed is 10 m2 or more
  5. Specific lighting (light-up) performed on buildings and structures existing in the historical neighborhood formation area (* 2)
  6. Perspective of buildings and structures Specific lighting (light-up) for the part facing the landscape formation street (* 3)

※1 Refer to the Landscape Ordinance Enforcement Regulations Article 8-2, Paragraph 1, Item 1 (outside site)
※2 See 7 of Plan Figure 1 (PDF: 2,520KB)
※3 Refer to 3 of Plan Figure 1 (PDF: 5,325KB)

2-3 Procedures

  • Please submit a report at least 31 days before the start of construction. (Construction cannot be started unless 30 days have passed since the date of notification.)
  • Please submit "registration form of act in area of scenery plan" and two copies (primary, secondary) attached book.
  • Please submit one copy of the "Landscape Plan Checklist".
  • If you change the content of the notification before the completion of construction, please notify the change at least 31 days before the start of the part related to the change. (Unless 30 days have passed since the date of notification of the change, construction of the changed part cannot be started.)

Format download

seal is not required for registration form and the notice.

Attached books

Attached books
  Book name Contents specified in the book Scale
1 Location map Site location and surrounding conditions 1/2500 or more
2 Photographs Site and surrounding conditions
3 Layout drawing Location of activities on the premises 1/100 or more
4 Elevations Two or more sides, coloring (number of the mussel color system is also described) 1/50 or more
5 Photomontage CG looking at the target from the specified point

※We may ask you to submit separately about floor plan and other books that the mayor deems necessary.
※If the mayor recognizes that there is no problem depending on the type and scale of the act, we can omit a part of the book.
※If the scale of the act is large, the scale can be set according to the scale of the act.
※If there is a possibility that you can see it from the viewpoint of the view, please submit a photo taken from the viewpoint of the view.

3 Urban Landscape Consultation Area

3-1 Text and Figures

3-2 Acts subject to consultation

Urban landscape formation act

  1. New construction, extension, renovation, relocation of buildings (excluding extensions and renovations without change in appearance) ※1
  2. Repairs, remodeling, or color changes that will change the appearance of the building, whose total found area of the part to be changed is 10 m2 or more
  3. New construction, extension, renovation, relocation of structures (steel towers, decorative towers, watching towers, etc.) that are fixed on land or buildings with a height of more than 45m from the ground surface (remodeling without changing the appearance) Excluding)
  4. Repairs, remodeling, and colors that change the appearance of structures (steel towers, decorative towers, watch towers, etc.) that are fixed on land or buildings and whose height from the ground surface exceeds 45m2 or more In addition, the total number of found areas to be changed is 10m2 or more
  5. Display of outdoor advertising materials on rooftop signboards, wall signboards, sleeves signboards or billboards or articles that display outdoor advertising materials (Total display area for private use is 10 m2 (“Display of outdoor advertising materials in Kannai-District's landscape plan) Items related to restrictions on acts related to the installation of properties that post outdoor advertising materials, if the area (limited to less than 10 m2) is specified separately.)
  6. Specific lighting (light-up) (limited to those performed on the Historic buildings shown in Figure 4 (PDF: 2,290KB))

※1 Excludes those that are temporarily installed for temporary construction site offices or special events, etc., and that the mayor recognizes that there is little impact on the landscape.

Act on Formation of Specific Urban Landscapes

After hearing opinion of Yokohama-shi city beauty measures council, we decide discussion policy.

  1. New construction and relocation of buildings with a height of more than 45m
  2. Extension, renovation, repair, remodeling, color change of part where the height of the building exceeds 45m (excluding those without a change in appearance)
  3. New construction, extension, renovation, relocation of structures (limited to towers, decorative towers, viewing towers, and the like) that are fixed on land or buildings with a height of more than 45m from the ground surface (without change of appearance) Excludes renovations)
  4. Repairs and remodeling that will change the appearance of structures (limited to steel towers, decorative towers, viewing towers, and the like) fixed on land or buildings whose height from the ground surface exceeds 45m By color change, the total Mitsuke area of the part involved in the change of appearance is more than half of the Mitsuke area of the entire work

3-3 Procedures

  • Please make a proposal for cityscape consultation after conducting prior consultation at the early stage of design. (Construction cannot be started until after the cityscape consultation has been completed.)
  • Please submit "cityscape consultation proposal book" and attached book three copies (for primary, secondary, reading).
  • For browsing, please do not state in advance any personal information or matters that may harm legitimate interests by making them public.
  • After the consultation, please install a "news of cityscape formation activity" sign at the site.
  • If you change the content of the consultation before the completion of construction, you will need to discuss the change in advance. (You cannot start construction of the changed part until after the consultation on the change has been completed.)

Format download

No application form and seal to registration form are required.

Attached books

Attached books
 

Book name

Contents specified in the book Scale 
1 Location map Site location and surrounding conditions 1/2500 or more
2 Photographs Site and surrounding conditions
3 Layout drawing Placement and maintenance policies for buildings, structures, approaches, exteriors and green spaces, etc. 1/100 or more
4 Elevations More than two sides, coloring 1/50 or more

※We may ask you to submit separately about floor plan and other books that the mayor deems necessary.
※If the mayor recognizes that there is no problem depending on the type and scale of the act, we can omit a part of the book.
※For sites that may be able to be seen from the viewpoint of the view, attach photos taken from the viewpoint of the view.

4 Kannai-District Urban Landscape Formation Guidelines

Kannai-District's landscape plan and the contents of the urban landscape consultation district are explained using examples in the Kannai-District Urban Landscape Formation Guidelines.

5-1 System Related

5-2 Consultation with the local community

Community development agreements have been established in the areas around Basyamichi and around Chinatown.

6 Contact points for notification and consultation

6-1 Window

 City of Yokohama, Urban Development Bureau Urban Renewal Division (29th floor of New City Hall)
 〒231-0005 6-50-10, Honcho, Naka-ku, Yokohama-shi
 TEL: 045-671-2673 Email address: [email protected]

6-2 Online Application

Online procedures are also possible. Please consult with us in advance before proceeding.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Renewal Division, Urban Development Bureau Urban Renewal Department

Phone: 045-671-2673

Phone: 045-671-2673

Fax: 045-664-3551

E-Mail address [email protected]

Return to the previous page

Page ID: 273-369-135

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews