Road self-financing construction
Last updated on July 31, 2024.
What is road self-financing construction?
When person except road manager performs construction about road, we must receive approval of road manager (road law Article 24 (outside site)).
Application details for main road self-financing construction
- Sidewalks, L-shaped gutters, curbs devaluation work for vehicles entering parking lots, etc.
- Relocation or removal of car stops and tree-planting basins for vehicles entering parking lots, etc.
- Relocation of curved mirrors, street trees, etc. (telephone poles are permitted by NTT, telephone poles are permitted by Tokyo Electric Power Company)
- Devaluation work for setting designated roads
- Repair and restoration of damaged pavement
- Road maintenance associated with development and residential land development
- In addition, when making changes to road structures
- Construction loading road (when the sidewalk is cut down and used as a construction vehicle approach road for construction)
Documents required for application
Application for Approval of Road Construction, etc. (City of Yokohama, Road and Highway Bureau)
In making application, please confirm "guide of road self-financing construction".
Attached books
- Guide map (specify the location with a copy of a house map, etc.)
- Floor plan (illustrates the construction site and details of the construction so that the entire site can be understood)
- Vertical Crossing
- Structural diagram
Road Structure Standard Maps (City of Yokohama, Road and Highway Bureau)
L-shaped gutters, U-shaped gutters, asphalt concrete pavement, ground boundary blocks, etc.
“Yokohama City Sewerage Design Standard Map” (Sewerage and Rivers Bureau, Yokohama City)
LU-type gutters, LO-type gutters, rainwater basins (city culverts), etc.
- Current status photo (the construction site is known)
- Copy of road ledger map or copy of boundary investigation map such as road waterway
Road ledger map (Yokohama-shi administrative map information) (outside site)
Road and waterway boundary survey map (available in Public Works Office if the boundary is determined)
- Copy of official map
- Construction estimate (only the price of road self-financing construction)
※Please submit one copy of enforcement approval application such as road construction, two copies of other attached books.
Flow of procedures for applying for self-financing construction
- The standard processing period is 30 days from the submission of the application form to the issuance of the approval form.
- About construction on road, it is necessary to receive "road use permission" from police chief in charge other than approval by road manager.
- After the completion inspection, the facility will be handed over to the road manager (attribution) and will be managed by the road manager. However, if there is a defect in the construction, the applicant must repair the defective facility and compensate for any damage to a third party. The defect security period is one year from the date of issuance of the pass notification.
- Please note that if you do not submit a notification of completion, the applicant will continue to manage it.