Ring Route 3 (Hinominami / Koyamadai area)

Ring Route 3 (Hinominami / Koyamadai area) was a section that was provisionally maintained in 1969, and was used in provisional two lanes with a median strip.
In recent years, the maintenance of the entire Ring Route 3 has progressed, and the front and rear sections have four lanes, but the Hinominami and Koyamadai districts, which are used in two lanes, have become bottlenecks that hinder traffic flow, causing traffic congestion. Was. To this end, we are promoting a four-lane project aimed at facilitating traffic flow.
On March 24, 2022, we started operation with four lanes.

Ring Route 3 (Hinominami / Koyamadai area) Business Overview
Business districtRing Route 3 (Hinominami / Koyamadai area)
SectionKosugegaya 4-chome, Sakae-ku to Konandai 9-chome, Konan-ku
Fiscal yearFrom FY2013 to FY2013
ScaleApproximately 1,200m in length Standard width 22m (4 lanes)
Maintenance effect
  • Facilitation of traffic flow
    • With four lanes, traffic capacity will be increased and traffic congestion will be eased. In addition, it improves its function as an emergency transportation route in the event of a disaster.
  • Traffic safety measures
    • A large walking space is secured by changing the sidewalk that has become narrow due to continuous planting to a single tree planting.
    • Replant street trees and increase the distance between tree planting to improve visibility.
    • By installing a crossing prevention fence in the center of the roadway, pedestrian crossing will be prevented.
    • We will reduce the steps between the sidewalk and the roadway, and promote barrier-free that is friendly to pedestrians.
  • Reduction of load on road environment
    • By reducing traffic congestion due to the shift to four lanes, CO2 emissions along the road can be reduced.
    • By making the roadway low-noise pavement, noise during vehicle driving is reduced.
Business progress rate※100%
Current construction contract details

There is no construction currently under contract.

Notice Concerning ConstructionThere is no notice of construction at this time.
Related information

◆Road improvement work briefing session
  December 4, 2019 Koyamadai district briefing session document (PDF: 872KB)


※The business progress rate is shown as the execution rate of total operating expenses.

Business Section


Photo
Before 4 lanes

After 4 lanes


p



You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Construction Division, Construction Department, Road and Highway Bureau Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

E-Mail address do-kensetsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 234-505-661

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews