Menu

Close

The text is from here.

76.(Tentative name) Post-survey results report on the Koshiba oil storage facility site park maintenance plan (Part 2 during construction)

Last updated on December 14, 2023.

Post-Survey Results Report (Part 2 during construction)

(Tentative name) About Koshiba oil storage facility ruins park maintenance plan post-survey result report (part 2 during construction), please see the following PDF file.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.

Main part

  • Chapter 1 Plans for Target Businesses
    • 1.1 Name and location of the business
    • 1.2 Name of the target business
    • 1.3 Type and scale of the target business
    • 1.4 Implementation area of the target project
    • 1.5 Overview of the Target Business
      • 1.5.1 Theme and Direction
      • 1.5.2 Maintenance Policy
      • 1.5.3 Zoning and Major Facilities
      • 1.5.4 Facility layout plan
      • 1.5.5 Maintenance schedule
      • 1.5.6 Construction plan 
  • Chapter 2 Post-Survey Results
    • 2.1 Items and methods of post-survey described in the post-survey plan
    • 2.2 Date and period of post-survey
    • 2.3 Forecast results, environmental conservation targets and measures for the conservation
    • 2.4 Consideration of post-survey results

Status of Procedures

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Environmental Impact Assessment Division, Green Environment Bureau Environmental Conservation Department

Phone: 045-671-2495

Phone: 045-671-2495

Fax: 045-663-7831

E-Mail address [email protected]

Return to the previous page

Page ID: 197-061-388

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews