現在位置
- Yokohama-shi Top Page
- Living, procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental assessment
- Business in Yokohama City
- 76. (Tentative name) Koshiba oil storage facility site park maintenance plan procedure of environmental impact assessment
- 76.(Tentative name) Post-survey results report on the Koshiba oil storage facility site park maintenance plan (3 during construction)
Last updated on October 5, 2022.
The text is from here.
76.(Tentative name) Post-survey results report on the Koshiba oil storage facility site park maintenance plan (3 during construction)
Post-Survey Results Report (Part 3 during construction)
(Tentative name) As for the post-survey result report (three during construction) pertaining to Koshiba oil storage facility ruins park maintenance plan, please see the following PDF file.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Main part
- Cover, First, Table of Contents
- Chapter 1 Plans for Target Businesses
- 1.1 Name and location of the business
- 1.2 Name of the target business
- 1.3 Type and scale of the target business
- 1.4 Implementation area of the target project
- 1.5 Overview of the Target Business
- 1.5.1 Theme and Direction
- 1.5.2 Maintenance Policy
- 1.5.3 Zoning and Major Facilities
- 1.5.4 Facility layout plan
- 1.5.5 Maintenance schedule
- 1.5.6 Construction plan
- Chapter 2 Post-Survey Results
- 2.1 Items and methods of post-survey described in the post-survey plan
- 2.2 Date and period of post-survey
- 2.3 Results of post-survey
- 2.4 Forecast results, environmental conservation targets and measures for the conservation
- 2.4 Consideration of post-survey results
- 2.6 Trustee of post-survey
- Reference Materials
- Analysis Results and Considerations of Arsenic and Lead
Remarks
In preparing the 1/25,000 and 1/10,000 figures used in this document, the base map information maintained and edited by the Geographical Survey Institute is used.
Status of Procedures
Please refer to “76. (tentative name) Koshiba Reservoir Facility Site Park Maintenance Plan Environmental Impact Assessment Procedure” for the status of this project.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Green Environment Bureau Environmental Conservation Department
Phone: 045-671-2495
Phone: 045-671-2495
Fax: 045-663-7831
E-Mail address mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 759-561-265