Menu

Close

The text is from here.

87.Post-survey results report pertaining to the current city hall block utilization project in Yokohama City (Part 1 under construction) 

Last updated on August 25, 2023.

Post-Survey Results Report (Part 1 during construction)

About Yokohama-shi present city hall block utilization business ex-post investigation result report (the 1 during construction), please see the following PDF file.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
In addition, PDF files cannot be printed due to the circumstances of the business operator.

Main part

  • Chapter 1 Plans for Target Businesses
    • 1.1 Name and address of the business operator
    • 1.2 Name of the target business
    • 1.3 Type and scale of the target business
    • 1.4 Implementation area of the target project
    • 1.5 Overview of the Target Business
    • 1.6 Progress of Implementation of Target Projects
    • 1.7 Construction plan
    • 1.8 Trustee of post-survey
  • Chapter 2 Matters concerning the implementation of post-survey
    • 2.1  Items and methods of post-survey described in the post-survey plan
    • 2.2  Period, etc. of the post-survey
  • Chapter 3 Post-Survey Results
    • 3.1 Waste and construction soil
    • 3.2 Noise
    • 3.3 Vibration
    • 3.4 Measures for the conservation of the Environment

Remarks

  • Of maps used in PDF file, about map issued by Yokohama-shi, we obtained approval of the mayor of Yokohama and duplicated one-2500 electronic topographic map. (Approval number order No. 5, Tokyo Metropolitan Government No. 9108)
  • If a third party duplicates further, it must obtain the approval of the mayor of Yokohama.

Status of Procedures

Please refer to “87. Yokohama City Current City Hall Block Utilization Project Environmental Impact Assessment Procedure” for the status of procedures for this project.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Environmental Impact Assessment Division, Green Environment Bureau Environmental Conservation Department

Phone: 045-671-2495

Phone: 045-671-2495

Fax: 045-663-7831

E-Mail address [email protected]

Return to the previous page

Page ID: 843-901-488

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews