Menu

Close

The text is from here.

Implementation policies and materials

Last updated on March 22, 2019.

Implementation Policy

Yokohama City Sewerage Bureau Northern Sludge Treatment Center digestion gas power generation equipment maintenance project implementation policy (PDF: 100KB)

Materials (drawings and data)

Northern sludge treatment center overall figure and business target point (PDF: 85KB)
Northern sludge treatment center overall flow chart (PDF: 121KB)
Total flow sheet of digestion gas power generation equipment (PDF: 153KB)
Gas generator building 1st basement floor equipment layout plan (PDF: 86KB)
Gas generator building 1st basement floor equipment layout plan (2) (PDF: 93KB)
Gas generator building 1st floor equipment layout plan (PDF: 110KB)
Gas generator building 1st floor equipment layout plan (2) (PDF: 113KB)
Gas generator building 2nd floor equipment layout plan (PDF: 87KB)
Gas generator building 2nd floor equipment layout plan (2) (PDF: 88KB)
Gas generator building 3rd floor equipment layout plan (PDF: 90KB)
Cross-sectional view of gas generator building equipment (PDF: 78KB)
Cross-sectional view of gas generator building equipment (2) (PDF: 66KB)
Gas power generation equipment power grid diagram and usage status (PDF: 68KB)
Northern sludge treatment center single line connection map (PDF: 192KB)
Single line drawing of digestion gas power generation facilities (PDF: 109KB)
Northern Sludge Treatment Center System Configuration Map (PDF: 115KB)
Gas generator building 2nd floor high pressure, low pressure, control room panel layout (PDF: 112KB)
Gas generator building 2nd floor high pressure, low pressure, control room panel name (PDF: 205KB)
Results of gas consumption (FY200-FY2005) (Excel: 56KB)
Amount of gas generated (FY14 and FY15) (Excel: 27KB)
Power receiving electricity, etc. in the northern second sewage treatment plant (Excel: 45KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Sewerage and Rivers Bureau Sewer Facilities Division

Phone: 045-671-2851

Phone: 045-671-2851

Fax: 045-550-4094

E-Mail address [email protected]

Return to the previous page

Page ID: 827-270-799

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews