Menu

Close

The text is from here.

Business recruitment guidelines, etc.

Last updated on March 22, 2019.

Application Guidelines for Business Operators

Yokohama-shi sewer station northern sludge treatment center digestion gas power generation facilities maintenance business open call for participants essential point (PDF: 157KB)

Business Requirements Standard

Yokohama City Sewerage Bureau Northern Sludge Treatment Center digestion gas power generation equipment maintenance business duties requirements standard book (PDF: 43KB)

Priority negotiating right holder selection criteria

Yokohama City Sewerage Bureau Northern Sludge Treatment Center digestion gas power generation equipment maintenance business superior negotiating right holder selection criteria (PDF: 27KB)

Business requirements standards document (drawings and data)

Northern sludge treatment center overall map and business target points (Attachment-1) (PDF: 426KB)
Northern sludge treatment center overall flow chart (Attachment-2) (PDF: 492KB)
Northern sludge treatment center overall flow sheet (current situation) (Attachment-3) (PDF: 188KB)
Northern sludge treatment center overall flow sheet (project target point) (Attachment-4) (PDF: 187KB)
Gas generator building 1st basement floor equipment layout plan (Attachment-5) (PDF: 191KB)
Gas generator building 1st floor equipment layout plan (Attachment-6) (PDF: 167KB)
Gas generator building 2nd floor equipment layout plan (Attachment-7) (PDF: 111KB)
Gas generator building 3rd floor equipment layout plan (Attachment-8) (PDF: 143KB)
Cross-sectional view of gas generator building equipment layout (Attachment-9) (PDF: 304KB)
Cross-sectional view of gas generator building equipment (2) (Attachment-10) (PDF: 208KB)
Northern sludge treatment center single line connection map (Attachment-11) (PDF: 571KB)
Gastrointestinal gas generator unit line (enlarged) (Attachment-12) (PDF: 152KB)
Gas generator building 2nd floor high pressure, low pressure, control room panel layout (Attachment-13) (PDF: 199KB)
Northern Sludge Treatment Center System Configuration Map (Attachment-14) (PDF: 229KB)
System Configuration Map (Enlarged) (Attachment-15) (PDF: 27KB)
Amount of digestive gas generated (FY2002) (Attachment-16-1) (Excel: 20KB)
Amount of digestive gas generated (FY2003) (Attachment-16-2) (Excel: 20KB)
Results of gas consumption (FY200-FY2005) (Attachment-17) (Excel: 45KB)
FY2003 Northern Sludge Treatment Center digestion gas power generation + safe combustion amount (Attachment-18) (Excel: 52KB)
Digestive gas components (Attachment-19) (Excel: 27KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Sewerage and Rivers Bureau Sewer Facilities Division

Phone: 045-671-2851

Phone: 045-671-2851

Fax: 045-550-4094

E-Mail address [email protected]

Return to the previous page

Page ID: 695-953-033

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews