Overview of the Kosuzume Purifiction Plant Facility

Kosuzume Purifiction Plant Kosuzume Recreation Plant

Kosuzume Purifiction Plant uses the Sagami River, which runs through the center of Kanagawa Prefecture. Construction was completed in 1965 as co-operated facility in Yokohama City (water supply and industrial water supply) and Yokosuka City, and after two expansion work, the current processing capacity is 820,000 cubic meters per day (about 2.5 cups of Yokohama Stadium). The purified water is supplied mainly to the southern areas of Konan Ward, Asahi Ward, Isogo Ward, Kanazawa Ward, Kohoku Ward, Totsuka Ward, Sakae Ward and Izumi Ward in Yokohama, and also to Yokosuka. It is responsible for about one-third of Yokohama City as a whole and about one-half of Yokosuka City as a whole.

outline at the Kosuzume Purifiction Plant facility
Location 2470, Kosuzumecho, Totsuka-ku, Yokohama-shi
Site area 237,905 square meters
Processing capacity 820,000 cubic meters per day
Water source Sagami River (Banyu River)
Processing method Rapid filtration method
Sinking pond Sludge blanket type (with pal sweater and inclined tube)
 There are 10 ponds with a processing capacity of 50,000 cubic meters per day.
Sidestream type (with inclined plate)
 There are four ponds with a processing capacity of 80,000 cubic meters per day.
Filtration pond There are 54 ponds of 116 square meters.
Reservoir Total effective water storage capacity 137,300 cubic meters

Kosuzume Purifiction Plant Floor Plan

1 Central Management Office

Photo of the Central Administration Office

It is the heart of the water purification plant and operates and monitors all facilities 24 hours a day.

2 Pumping Pump

Photo of the pump

Incorporated from the Sagami River, the water (raw water) arriving at a point 40 meters underground is assembled on the ground.

3 Arriving Mizui

Photograph of arrival Mizui

The amount of raw water pumped by the pump is adjusted here and sent to the sinking pond.

4 Sinking Pond

Photo of the sinking pond

Inject a flocculant (polyaluminum chloride) into the raw water. Floating objects become large lumps (flocks) and sink. Photovoltaic panels prevent the growth of algae and at the same time make effective use of electricity.

5 filtration pond

Photo of the filter pond

Small suspended matter that was not removed in the sedimentation basin is removed through layers of sand and gravel. Photovoltaic power generation is performed using a cover to prevent foreign material contamination.

6 Reservoir (No. 2)

Photo of Reservoir

In a warehouse that stores tap water, the amount of water is adjusted according to the amount of water used and distributed to homes, schools, factories, etc. The upper part is used by citizens as a sports park.

7 Reservoir (No. 6)

Photo of Reservoir

It is a cylindrical ground reservoir. In addition to water supply to the city, it is also used for washing water for filtration ponds.

8 Water quality instruments

Photos of water quality instruments

In order to always send safe water, we constantly monitor the quality of the finished water (purified water) from raw water.

9 Drainage Pond

Photographs of drainage area

The impurities removed from the sinking pond and the filtration pond are concentrated here, then sent to Sewerage and Rivers Bureau Nambu Sewerage Center for processing.

10 Hybrid Outer Lights

Photo of Hybrid Outer Lights

We have installed three external lights that turn on only electricity generated by solar and wind power. This is one of the measures to reduce environmental impact.

11 Electric cart

Photo of an electric cart

If you are worried about walking around a large area, we will guide you with an electric cart that does not disturb the environment.

12 Fresh drinking fountain

Photo of a freshly made drinking fountain

We have set up a drinking fountain so that visitors to the water purification plant can drink the freshly made water.

Other water purification plant introduction pages
 Kawai Purification Plant
 Nishiya Water Purification Plant

For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Phone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

Inquiries to this page

Water Works Bureau Water Purification Department Kosuzume Purifiction Plant

Phone: 045-851-1731

Phone: 045-851-1731

Fax: 045-851-7229

E-Mail address su-kosuzujosui@city.yokohama.lg.jp