About business such as landfill, Shinano-cho, Totsuka-ku

Last updated on October 17, 2024.

Projects to remove specific obstacles related to landfill, Shinanomachi, Totsuka-ku

Location map

Bird's-eye view


In order to remove obstacles to the living environment in conservation in landfill, industrial waste established by Sanko Co., Ltd. in Shinano-cho, Totsuka-ku, effective February 15, 2008, the Minister of the Environment agreed on the implementation plan of the "Project to Remove Specific Obstacles Related to landfill, Shinanocho, Totsuka-ku" on February 15, 2008.
Since some of the plan targets have not been achieved, we will receive the consent of the Minister of the Environment on March 26, 2018, and continue our business until FY2022.

[Press Release on March 26, 2018]
pdf About extension of business such as specific obstacle removal to affect landfill, Shinano-cho, Totsuka-ku (PDF: 358KB)
pdf Project implementation plan for removing specific obstacles pertaining to landfill, Shinano-cho, Totsuka-ku (PDF: 8,180KB) (consent to change on March 26, 2018)

pdf Project implementation plan (PDF: 7,504KB) for specific problem removal related to landfill, Shinano-cho, Totsuka-ku (change agreement on March 26, 2013)

[Press Release on February 15, 2008]
pdf Acquisition of consent from the Minister of the Environment for a project implementation plan for removing specific obstacles related to landfill, Shinano-cho, Totsuka-ku (PDF: 247KB)
pdf Project implementation plan (PDF: 3,321KB) such as specific obstacle removal pertaining to landfill, Shinano-cho, Totsuka-ku

1 Process

In preparing an implementation plan for projects such as the removal of specific obstacles, a verification committee and a technical review committee were set up by experts such as academic experts, and based on the opinions of both committees, measures to prevent recurrence and construction plans for countermeasures. Etc. were considered.

(1) About Verification Committee
(2) About the Technical Review Committee

2 Outline of countermeasures

(1) Overview of Construction Plan

1) Measures to prevent the spread of groundwater contamination

By eliminating sewage in the disposal site, we will remove pollution sources and control the leakage of sewage. In addition, wells are installed at groundwater contamination points to prevent the spread of contamination by pumping up and removing contaminated groundwater.

2) Measures to prevent the collapse of piled waste

After installing earth retaining, etc. (deep foundation wall), the steep slope is shaped into a stable slope to prevent waste from collapsing outside the site. In addition, the soil is covered with the waste after shaping to prevent the scattering and outflow of waste.
pdf Measures to prevent waste collapse (PDF: 1,107KB)

3) Schedule

In 2008, we started installation work for pumping wells for sewage, etc., installation work for retaining walls in 2009, and shaping work for stacked waste in 2010.
pdf Construction schedule (PDF: 93KB)

(2) Announcement of Shinano Town Improvement Work

The leaflets distributed to nearby residents are posted.
pdf News of Shinano-cho improvement construction Vol.1 (PDF: 445KB) (December 2008)
pdf News of Shinano-cho improvement construction Vol.2 (PDF: 496KB) (July 2009)
pdf News of Shinano-cho improvement construction Vol.3 (PDF: 771KB) (December 2010)
pdf News of Shinano-cho improvement construction Vol.4 (PDF: 434KB) (December 2011)
pdf News of Shinano-cho improvement construction Vol.5 (PDF: 392KB) (September 2012)
pdf News of Shinano-cho improvement construction Vol.6 (PDF: 419KB) (October 2013)

3 Monitoring of the impact of the surrounding environment

1) Prevention of the spread of groundwater contamination
2) Prevention of collapse of piled waste

(2) Response to abnormality

The Business Waste Management Section strengthens the monitoring system in the event of abnormal weather or an earthquake, and checks local safety.

Monitoring items in case of abnormality
Monitoring itemsCriteria
RainfallWhen the rainfall intensity of 50 mm / hour or the continuous rainfall exceeds 150 mm at the Higashitotsuka Fire Branch Office
In the event of an earthquakeSeismic intensity 4 or more

4 Responsibility to Executers, etc.

We will continue to pursue responsibility for executors who have left improper conditions for many years, including the collection of administrative substitute execution costs. In addition, we will continue to investigate whether or not there is any violation of laws and regulations, and will pursue responsibility if there is a violation.

(1) Regarding the collection of expenses from the executor

A payment order and reminder were issued to the executor using the expenses required for the construction that had already been finalized as receivables, but the payment was delinquent. For this reason, we have seized construction heavy equipment left in the disposal site and property (deposits, real estate, etc.) owned by former officers and exchanged them through public auctions, etc., and collected about 7 million yen so far.

(2) Proposal for voluntary removal of waste related to landfill, Shinano-cho, Totsuka-ku

We conducted a survey of waste discharge companies and received proposals from 25 companies for voluntary removal of waste.

pdf About the implementation status of voluntary removal (PDF: 120KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Waste Management Division, Resources and Waste Recycling Bureau Business Waste Management Department

Phone: 045-671-3811

Phone: 045-671-3811

Fax: 045-663-0125

E-Mail address [email protected]

Return to the previous page

Page ID: 563-855-228

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews