Menu

Close

  1. Yokohama-shi Top Page
  2. Business
  3. Menu by field
  4. Child Care
  5. Development of licensed nursery schools
  6. Interior maintenance cost subsidy project
  7. Opened in April 2021 Interior Maintenance Cost Subsidy Project (Priority Consultation)

The text is from here.

Opened in April 2021 Interior Maintenance Cost Subsidy Project (Priority Consultation)

Last updated on October 15, 2019.

Business Overview

With "Yokohama citizen nursery school interior maintenance costs assistance business", Yokohama-shi assists a part of expense necessary for repair work to maintain authorized nursery school by repair of building.
[Target]
Development of newly licensed nursery schools and branch gardens (new construction, renovation of existing buildings, etc.)
Increase, expand, or renovate existing daycare centers (when more than 20 authorized capacity can be increased)

What is Priority Consultation?

The maintenance plan for opening in April 2021 will be grasped as a specific maintenance project, and consultations will be accepted so that preparations for maintenance can be smoothly advanced.
By consulting during the priority consultation period, it will be possible to omit the prior consultation in the primary recruitment of the interior maintenance cost subsidy project scheduled to open in April 2021, which will be implemented in the future.

Partial relaxation of building and equipment standards

Currently, we are relaxing the equipment standards for wheelchair-applied elevators and ostomate faucet equipment based on the "Summary Article 4 of the Yokohama Citizen Nursery School Installation Authorization and Confirmation", but maintenance projects will be opened after April 1, 2021. We plan to continue to be eligible for mitigation.
Please note that it will take a reasonable period of time, as it will be necessary to review and confirm whether or not the mitigation is applied for each project.
Please contact us for details, such as the current relaxation content and period.

About consultation method

1. Consultation period
From Tuesday, October 15, 2019 to Friday, November 29

2. Contact information
・Thing about childcare needs of important point maintenance area, area where maintenance is necessary, each ward
[Contact in charge] City of Yokohama, Child and Youth Bureau Childcare Measures Section
TEL: 045-671-4220
[Email address] [email protected]
[person in charge] Yoshida, Okui

・Thing about facility equipment standard, application procedure, etc.
[Contact in charge] City of Yokohama, Child and Youth Bureau Children's Facility Maintenance Division
TEL: 045-671-2047
[Email address] [email protected]
[person in charge] Support for interior maintenance costs Kanazawa, Sonaka, Sakurai

3. About consultation method
After making a reservation over the phone, please bring a document that shows the outline of the plan, such as the "Priority Consultation Form" (downloadable from the following) and the location map and floor plan.
After having you inquire about childcare needs of maintenance area beforehand, please prepare "priority consultation book".

4. Download styles, etc.
 (1)About conduct of important point consultation (PDF: 776KB)
 (2)Important consultation book (word: 32KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Child and Youth Bureau Childcare and Education Department Children's Facility Maintenance Division

Phone: 045-671-4146

Phone: 045-671-4146

Fax: 045-550-3606

E-Mail address [email protected]

Return to the previous page

Page ID: 608-905-062

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews