- Yokohama-shi Top Page
- Business
- Menu by field
- Fire fighting, first aid
- Fire prevention management
- High Pressure Gas Safety Act
- Applications and notifications related to the High Pressure Gas Safety Law
The text is from here.
Applications and notifications related to the High Pressure Gas Safety Law
Last updated on March 15, 2021.
This page provides information on applications and notifications related to the High Pressure Gas Safety Law.
Application and Notification Forms for High Pressure Gas Safety Act and attached documents
Please check the contents of each guide and arrange the required documents and submit it.
Please select the applicable one from the following 1 to 3 and check the contents of each guide. (After clicking, jump to each guide on the page.)
① The procedures related to the General Gas Safety Regulations, Liquefied Petroleum Gas Safety Regulations, Container Security Regulations, and Container Security Regulations for International Mutual Approval are here.
② Click here for procedures related to refrigeration security rules.
③ Click here for procedures related to security rules for industrial complexes. ※Please refer to here if you need procedures related to specific high-pressure gas consumption at facilities subject to security regulations such as industrial complexes.
※Procedures related to the General Gas Safety Regulations, Liquefied Petroleum Gas Safety Regulations, Container Security Regulations, and Container Security Regulations for International Mutual Approval
List of High Pressure Gas Manufacturing Forms |
|||
---|---|---|---|
Rule style | |||
1 |
Application for High Pressure Gas Production Permit | General Rules Style No. 1 (word: 19KB) |
|
2 | High Pressure Gas Production Business Notification | General Regulations No. 2 (word: 18KB) |
|
3 |
Type 1 Manufacturing Business Succession Notification | General Rules No. 3 (Word: 19KB) |
|
4 | Type 2 Manufacturing Business Succession Notification | General Regulations No. 3-2 (word: 18KB) |
|
5 |
Application for permission to change high-pressure gas manufacturing facilities, etc. |
General Regulations No. 4 (word: 19KB) |
|
6 |
Notification of minor changes to high-pressure gas manufacturing facilities | General Regulations No. 5 (word: 18KB) |
|
7 | Notification of change of high-pressure gas manufacturing facilities, etc. | General Regulations No. 6 (Word: 18KB) |
|
8 |
Notification of start of high-pressure gas production | General Rules Style No. 23 (Word: 18KB) |
|
9 |
Notification of the abolition of high-pressure gas production | General Rules Style No. 24 (Word: 19KB) |
|
10 |
Notification of Hazard Prevention Regulations | General Rules Style No. 32 (Word: 19KB) |
|
11 |
Notification of High Pressure Gas Safety Supervisor | General Rules Style No. 33 (Word: 19KB) |
|
12 |
Notification of High Pressure Gas Safety Technology Manager, etc. | General Regulations No. 33-2 (word: 18KB) |
|
13 |
Notification of Chief of High Pressure Gas Safety | General Rules Style No. 34 (Word: 19KB) |
|
14 |
Notification of Agent for High Pressure Gas Safety | General Regulations No. 37 (word: 20KB) |
|
Outline style | |||
1 |
Security Supervisor Notification | ||
2 | Notification of changes to high-pressure gas | Outline style No. 40 (word: 29KB) | |
Reference style | |||
1 |
Production Plan | ||
2 |
Equipment list | ||
3 |
CVaries of Appointed Persons | ||
4 |
Details of changes to manufacturing facilities, etc. |
List of forms related to completed inspection and security inspection |
|||
---|---|---|---|
Rule style | |||
1 |
Application for completion inspection of manufacturing facilities | General Rules Style No. 13 (Word: 19KB) |
|
2 |
Type 1 Storage Completion Inspection Application Form | General Regulations No. 14 (word: 19KB) |
|
3 |
Notification of completion inspection of the High Pressure Gas Safety Association | General Regulations No. 17 (word: 19KB) |
|
4 | Notification of completion inspection of designated completion inspection organization completion inspection | General Regulations No. 18 (word: 19KB) |
|
5 | Notification of suspension of high-pressure gas manufacturing facilities | General Regulations No. 37-2 (word: 19KB) |
|
6 | Security Inspection Application Form | General Rules Style No. 38 (Word: 21KB) |
|
7 | High Pressure Gas Safety Association Security Inspection Notification Form | General Rules Style No. 40 (word: 20KB) |
|
8 | Designated Security Inspection Organization Security Inspection Notification Form | General Rules Style No. 41 (word: 20KB) |
|
Outline style | |||
1 | Notification of completion of construction | Outline style 20th (word: 28KB) |
List of products related to sales of high-pressure gas |
|||
---|---|---|---|
Rule style | |||
1 |
High Pressure Gas Sales Business Notification | General Rules Style No. 21 (Word: 18KB) |
|
2 |
Notification of succession of high-pressure gas sales business | General Regulations No. 21-2 (word: 18KB) |
|
3 |
Notification of change in type of high-pressure gas related to sales | General Rules Style No. 22 (Word: 18KB) | |
4 | Notification of abolition of high-pressure gas sales business | General Rules Style No. 26 (Word: 18KB) |
|
5 | Notification of Chief of High Pressure Gas Sales | General Rules Style No. 35 (Word: 19KB) |
|
Outline style | |||
1 | Notification of changes to high-pressure gas | Outline style No. 40 (word: 29KB) | |
Reference style | |||
1 | CVaries of Appointed Persons | Reference style No. 3 (word: 20KB) | |
2 |
Sales plan |
Reference Style No. 9 (word: 21KB) |
|
3 | Consumer Safety Ledger | Reference styles No. 10-1 to No. 10-3 (Excel: 18KB) | |
4 | Sales ledger (container transfer record book) | Reference Style No. 11 (Excel: 11KB) |
List of High Pressure Gas Consumption Styles |
|||
---|---|---|---|
Rule style |
|||
1 |
Specific high-pressure gas consumption notification |
General Rules Style No. 29 (Word: 18KB) |
|
2 |
Specified High Pressure Gas Consumer Succession Notification |
General Rules Style No. 29-2 (word: 18KB) |
|
3 |
Notification of change of specified high-pressure gas consumption facilities, etc. |
General Rules Style No. 30 (word: 19KB) |
|
4 | Notification of abolition of specified high-pressure gas consumption |
General Rules Style No. 31 (Word: 19KB) |
|
5 | Notification of Chief of Specified High Pressure Gas Handling |
General Rules Style No. 36 (Word: 19KB) |
|
Outline style | |||
1 | Notification of changes to high-pressure gas | Outline style No. 40 (word: 29KB) | |
Reference style |
|||
1 | CVaries of Appointed Persons | Reference style No. 3 (word: 20KB) | |
2 | Specific high-pressure gas consumption facilities, etc. |
||
3 | Changes in specified high-pressure gas consumption facilities, etc. |
List of import-related forms of high-pressure gas |
|||
---|---|---|---|
Rule style |
|||
1 |
Designated Import Inspection Organization Import Inspection Notification |
General Regulations No. 28-3 (Word: 19KB) |
List of containers related to high-pressure gas |
|||
---|---|---|---|
Rule style |
|||
1 |
Application for change of type or pressure of high pressure gas |
Container Rules No. 2 (word: 19KB) | |
2 | Application for Special Filling Permit | Container Rules No. 4 (word: 19KB) |
|
3 | Container Inspection Office Registration Application Form | Container Rules No. 5 (word: 20KB) |
|
4 | Application for renewal of registration of container inspection office |
Container Rules No. 6 (word: 20KB) |
|
5 | Notification of Inspector | Container Rules No. 8 (word: 19KB) |
|
6 | Notification of abolition of container inspection office | Container Rules No. 9 (word: 18KB) |
|
Outline style | |||
1 | Application for reinspection of containers and accessories | Outline style 30th (word: 29KB) | |
2 | Notification of changes to high-pressure gas | Outline style No. 40 (word: 29KB) | |
Reference style | |||
1 | CVaries of Appointed Persons | Reference style No. 3 (word: 20KB) | |
2 | Details of changes | Reference Style No. 12 (Excel: 12KB) | |
3 | Materials related to the performance of containers | Reference Style No. 13 (Excel: 12KB) |
List of other forms related to high-pressure gas |
|||
---|---|---|---|
Rule style |
|||
1 |
Accident Report | General Regulations No. 58 (word: 19KB) |
|
1-2 |
Survey Report on High Pressure Gas Accidents (Disasters) |
High Pressure Gas / Complex Accident Response Guidelines Form 1 (Word: 42KB) | |
Outline style | |||
1 | High-pressure gas filling notification | Outline style 36th (word: 29KB) | |
2 | High Pressure Gas Minor Change Report ※Please use this form to report on the removal of independent manufacturing equipment. |
Outline style 37th (word: 29KB) | |
3 | Request for certification | Outline style 38th (word: 29KB) | |
4 | Notification of changes to high-pressure gas | Outline style No. 40 (word: 29KB) | |
5 | Notification of withdrawal of permission application, etc. | Outline style 41st (word: 29KB) | |
Reference style | |||
1 | Filling plan |
※ Procedures related to refrigeration security rules
List of High Pressure Gas Manufacturing Forms |
||
---|---|---|
Rule style |
||
1 |
Application for High Pressure Gas Production Permit | Frozen Rules No. 1 (word: 19KB) |
2 | High Pressure Gas Production Notification | Frozen Rules No. 2 (word: 20KB) |
3 | Type 1 Manufacturing Business Succession Notification | Frozen Rules No. 3 (Word: 18KB) |
4 | Type 2 Manufacturing Business Succession Notification | Frozen Rules No. 3-2 (word: 18KB) |
5 | Application for permission to change manufacturing facilities, etc. | Frozen Rules No. 4 (Word: 19KB) |
6 | Notification of minor changes to high-pressure gas facilities, etc. | Frozen Law No. 5 (word: 19KB) |
7 | Notification of change of high-pressure gas manufacturing facilities, etc. | Frozen Rules No. 6 (Word: 18KB) |
8 | Manufacturing Start Notification | Frozen Rules No. 15 (Word: 18KB) |
9 | Notification of the abolition of high-pressure gas production | Frozen Rules No. 16 (Word: 19KB) |
10 | Notification of Hazard Prevention Regulations | Frozen Rules Style No. 20 (Word: 19KB) |
11 | Notification of refrigeration security officer | Frozen Regulation Style No. 21 (Word: 19KB) |
12 | Notification of agent in charge of refrigeration security | Frozen Regulation Style No. 22 (Word: 19KB) |
Outline style | ||
1 | Notification of changes related to high-pressure gas | Outline style No. 40 (word: 29KB) |
Reference style | ||
1 | Manufacturing plan (other than combustible poison) | Reference style No. 1 (word: 33KB) |
2 | Manufacturing plan (type of combustible poison) | Reference style No. 2 (word: 40KB) |
3 | CVaries of Appointed Persons | Reference style No. 3 (word: 19KB) |
4 | Changes in manufacturing facilities, etc. (Type) | Reference style No. 4 (word: 34KB) |
5 | Details of manufacturing facilities, etc. (two types) | Reference style No. 5 (word: 28KB) |
6 | Details of changes to manufacturing facilities, etc. (two types) | Reference style No. 6 (word: 29KB) |
List of forms related to completed inspection and security inspection |
||
---|---|---|
Rule style |
||
1 |
Application for completion inspection of manufacturing facilities | Frozen Rules No. 7 (Word: 19KB) |
2 | Notification of completion inspection of the High Pressure Gas Safety Association | Frozen Rules Style No. 9 (Word: 19KB) |
3 | Notification of completion inspection of designated completion inspection organization completion inspection | Frozen Rules Style No. 10 (Word: 19KB) |
4 | Security Inspection Application Form | Frozen Regulation Style No. 23 (Word: 20KB) |
5 | High Pressure Gas Safety Association Security Inspection Notification Form | Frozen Rules Style No. 25 (Word: 19KB) |
6 | Designated Security Inspection Organization Security Inspection Notification Form | Frozen Regulation Style No. 26 (Word: 19KB) |
Outline style | ||
1 | Notification of completion of construction | Outline style 20th (word: 28KB) |
List of products related to sales of high-pressure gas |
||
---|---|---|
Rule style |
||
1 |
High Pressure Gas Sales Business Notification | Frozen Rules Style No. 13 (Word: 18KB) |
2 | Notification of succession of high-pressure gas sales business | Frozen Rules Style No. 13-2 (word: 18KB) |
3 | Notification of change in type of high-pressure gas related to sales | Frozen Rules No. 14 (Word: 18KB) |
4 | Notification of abolition of high-pressure gas sales business | Frozen Rules No. 17 (word: 18KB) |
Outline style | ||
1 | Notification of changes related to high-pressure gas | Outline style No. 40 (word: 29KB) |
Reference style | ||
1 | CVaries of Appointed Persons | Reference style No. 3 (word: 20KB) |
2 | Sales plan | Reference style No. 7 (word: 18KB) |
3 | Sales Office Security Ledger | Reference Style No. 8 (Excel: 12KB) |
List of High Pressure Gas Other Forms |
|||
---|---|---|---|
Rule style |
|||
1 |
Accident Report |
||
1-2 | Survey Report on High Pressure Gas Accidents (Disasters) | High Pressure Gas / Complex Accident Response Guidelines Form 1 (Word: 42KB) | |
Outline style | |||
1 | High Pressure Gas Minor Change Report ※Please use this form to report on the removal of independent manufacturing equipment. |
||
2 | Request for certification | Outline style 38th (word: 29KB) | |
3 | Notification of changes related to high-pressure gas | Outline style No. 40 (word: 29KB) | |
4 | Notification of withdrawal of permission application, etc. | Outline style 41st (word: 29KB) |
Procedures related to security rules for industrial complexes ※Please refer to here if you need procedures related to specific high-pressure gas consumption at facilities subject to security regulations such as industrial complexes.
List of High Pressure Gas Manufacturing Forms |
||
---|---|---|
Rule style |
||
1 |
Application for High Pressure Gas Production Permit |
Combi Rules Style No. 1 (word: 20KB) |
2 | Notification of Succession of High Pressure Gas Manufacturing Business |
Combi Rules Style No. 2 (Word: 19KB) |
3 | Application for permission to change high-pressure gas manufacturing facilities, etc. | Combi Rules Style No. 3 (Word: 19KB) |
4 | Notification of minor changes to high-pressure gas manufacturing facilities |
Combi Rules Style No. 4 (Word: 19KB) |
5 | Notification of start of high-pressure gas production |
Combi Rules Style No. 11 (Word: 18KB) |
6 | Notification of the abolition of high-pressure gas production |
Combi Rules Style No. 12 (Word: 19KB) |
7 | Notification of Hazard Prevention Regulations |
Combi Rules Style No. 13 (Word: 19KB) |
8 | Notification of High Pressure Gas Safety Supervisor |
Combi Rules Style No. 14 (word: 19KB) |
9 | Notification of High Pressure Gas Safety Technology Manager, etc. |
Combi Rules Style No. 14-2 (word: 19KB) |
10 | Notification of Chief of High Pressure Gas Safety |
Combi Rules Style No. 15 (word: 19KB) |
11 | Notification of Agent for High Pressure Gas Safety | Combi Rules Style No. 16 (Word: 20KB) |
12 | Certified advanced security implementer High-pressure gas manufacturing facilities, etc. Notification of change | Combi Rules Style No. 34-7-9 (word: 19KB) |
Outline style | ||
1 | Security Supervisor Notification | Outline Style No. 11 (word: 30KB) |
Reference style | ||
1 | CV of the elected person (Security Supervisor, etc.) | City combination reference style seventh (word: 35KB) |
2 | Overview of High Pressure Gas Safety Management Organization | City combination reference style eighth (word: 36KB) |
3 | Overview of Specific Facilities | City combination reference style tenth (word: 35KB) |
4 | Specific facility layout drawing or schematic flow sheet | City combination reference style eleventh (word: 34KB) |
5 | Security equipment for special reaction equipment | City combination reference style twelfth (word: 37KB) |
6 | Abatement facilities for toxic gas storage tanks | City combination reference style thirteenth (word: 47KB) |
List of forms related to completed inspection and security inspection |
|||
---|---|---|---|
Rule style |
|||
1 |
Application for completion inspection of manufacturing facilities |
||
2 |
Notification of completion inspection of the High Pressure Gas Safety Association |
||
3 |
Notification of completion inspection of designated completion inspection organization completion inspection |
||
4 | Notification of completion inspection record |
||
5 | Security Inspection Application Form |
||
6 | High Pressure Gas Safety Association Security Inspection Notification Form |
||
7 | Designated Security Inspection Organization Security Inspection Notification Form |
||
8 | Notification of suspension of high-pressure gas manufacturing facilities |
||
9 | Security Inspection Record Notification | Combi Rules Style No. 34 (Word: 19KB) | |
Outline style | |||
1 | Notification of completion of construction |
||
Reference style | |||
1 | Completion inspection report | City combination reference style first (word: 17KB) | |
2 | Summary of test results | City combination reference style 1-2nd (word: 17KB) | |
3 | Pressure resistance and airtightness test results | City combination reference style 1-3rd (word: 18KB) | |
4 | Infiltration test report | City combination reference style 1-4th (word: 19KB) | |
5 | Magnetic Fluid Test Report | City combination reference style 1-5th (word: 19KB) | |
6 | Ultrasound detection test report | City combination reference style 1-6th (word: 18KB) | |
7 | Radiation Transmission Test Report | City combination reference style 1-7th (word: 19KB) | |
8 | Ultrasonic thickness measurement results | City combination reference style 1-8th (word: 19KB) | |
9 | List of high-pressure gas manufacturing facilities | City combination reference style second (word: 16KB) | |
10 | List of storage tanks | City combination reference style 2-2 (word: 16KB) | |
11 | Overview of Security Inspections | City combination reference style third (word: 18KB) | |
12 | Regular voluntary (certified security) inspection report | City combination reference style fourth (word: 17KB) | |
13 | Voluntary (certified security) inspection result report of high-pressure gas manufacturing facilities | City combination reference style 4-2nd (word: 22KB) | |
14 | Voluntary (certified security) inspection results report (by equipment) | City combination reference style 4-3rd (word: 20KB) | |
15 | Voluntary (certified security) inspection result report (savings tank) | City combination reference style 4-4th (word: 18KB) | |
16 | Open test results | City combination reference style 4-5th (word: 42KB) | |
17 | Wail generation during open inspection (before and after pressure resistance test) | City combination reference style 4-6th (word: 50KB) | |
18 | Report on voluntary inspection results of high-pressure gas manufacturing facilities (for extended storage tanks) |
||
19 | Voluntary (certified security) inspection result report (Article 9 conduit) | City combination reference style 4-8th (word: 35KB) | |
20 | Voluntary (certified security) inspection result report (Article 10 conduit) | City combination reference style 4-9th (word: 36KB) | |
21 | Inspection report during operation of high-pressure gas manufacturing facilities | City combination reference style fifth (word: 36KB) | |
22 | Evaluation statement for extension of inspection period for high-pressure gas storage tank opening | City combination reference style sixth (word: 33KB) | |
23 | List of storage tanks subject to extension of open inspection period | City combination reference style 6-2nd (word: 36KB) | |
24 | List of storage tanks not subject to extension of open inspection period | City combination reference style 6-3rd (word: 36KB) | |
25 | List of evaluation items and evaluation criteria | City combination reference style 6-4th (word: 44KB) |
List of High Pressure Gas Consumption Styles |
|||
---|---|---|---|
Rule style |
|||
1 |
Specific high-pressure gas consumption notification |
General Rules Style No. 29 (Word: 18KB) |
|
2 |
Specified High Pressure Gas Consumer Succession Notification |
General Rules Style No. 29-2 (word: 18KB) |
|
3 |
Notification of change of specified high-pressure gas consumption facilities, etc. |
General Rules Style No. 30 (word: 19KB) |
|
4 | Notification of abolition of specified high-pressure gas consumption |
General Rules Style No. 31 (Word: 19KB) |
|
5 | Notification of Chief of Specified High Pressure Gas Handling |
General Rules Style No. 36 (Word: 19KB) |
|
Reference style | |||
1 | CV of the elected person (specified high-pressure gas handling chief) (City Combination Reference Style No. 9) | City combination reference style ninth (word: 34KB) |
List of High Pressure Gas Other Forms | |||
---|---|---|---|
Rule style | |||
1 | Accident Report | Combi Rules Style No. 37 (Word: 19KB) | |
1-2 | Survey Report on High Pressure Gas Accidents (Disasters) | High Pressure Gas / Complex Accident Response Guidelines Form 1 (Word: 42KB) | |
Outline style | |||
1 | High-pressure gas filling notification | Outline style 36th (word: 29KB) | |
2 | High Pressure Gas Minor Change Report ※Please use this form to report on the removal of independent manufacturing equipment. | Outline style 37th (word: 29KB) | |
3 | Request for certification | Outline style 38th (word: 29KB) | |
4 | Notification of changes related to high-pressure gas | Outline style No. 40 (word: 29KB) | |
5 | Notification of withdrawal of permission application, etc. | Outline style 41st (word: 29KB) |
Electronic application is also available for procedures related to the High Pressure Gas Safety Act.
Please refer to the electronic application information page for procedures and precautions that allow electronic application.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Fire Bureau Prevention Department Security Section
Phone: 045-334-6407
Phone: 045-334-6407
Fax: 045-334-6610
E-Mail address [email protected]
Page ID: 801-765-373