After contracting VE method

Implementation of the VE method in construction

Last updated on August 21, 2024.

 Regarding the construction and manufacturing (excluding the manufacture of goods) ordered by Yokohama City, in order to reduce the cost of construction by actively utilizing private technology development, after the conclusion of the contract, the construction specified in the design documents We accept proposals for changes in design documents related to construction materials, construction methods, etc. that can reduce the contract price without degrading the function and performance of the object.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Public Works Coordination Division, Finance Bureau Facility Management Promotion Office

Phone: 045-671-4084

Phone: 045-671-4084

Fax: 045-651-7599

E-Mail address [email protected]

Return to the previous page

Page ID: 382-217-598

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews