Menu

Close

The text is from here.

We have established a new fishway in Katabira River!

Last updated on September 11, 2018.

Ayu can now go up to the upstream!

In order to improve the upstream environment of ayu and other fish in Katabira River, we installed a fishway at the head of the Tsurumine Hashimoto style (completed in June 2017).
As a result, there was a drop of about 1.5m before installation, so Ayu, which had been stagnant downstream of the drop work, can now be confirmed upstream of the drop work.

※What is a difference?
The head work (floor stopper, floor fixing, and guard) is a structure that prevents river scouring and maintains the longitudinal and cross-sectional shape of the river.
Due to the drop work, the slope of the river is moderated, and the rapid flow during the flood is eased. Many rivers managed by Yokohama City have steep slopes, so in many cases, we have set up head works to prevent river excavation.

Fishway

Guide map

Upstream Survey

Inquiry about fishwaysPlease refer to "River Planning Division" for fishways.
River Planning Division: 045-671-2869
Action planKatabira River Action Plan, in which Ayu goes up
Click here for materials (PDF: 6,516KB)
Action plan
(Summary Version)
Katabira River Action Plan (summary version) in which Ayu goes up
Click here for materials (PDF: 1,379KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

River Basin Coordination Division, Sewerage and Rivers Bureau River Department

Phone: 045-671-4215

Phone: 045-671-4215

Fax: 045-651-0715

E-Mail address [email protected]

Return to the previous page

Page ID: 201-856-385

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews