Reduction of water charges associated with the operation of mist equipment, etc.

As a part of measures against summer heat, the Water Bureau has installed and spread a “mist device” with a cooling effect in the city, and has an effort to protect the city and tourists visiting the city from the heat (social contribution business). In order to install mist equipment, management fee is required to maintain initial costs such as equipment and installation costs, as well as water charges, electricity charges and maintenance costs. The Water Works Bureau will reduce or exempt "water charges used for mist".

Last updated on October 23, 2024.

Support for reduction and exemption of water charges associated with the operation of mist equipment

Requirements for Support

  • About mist equipment
    A pressurized mist device (*)
    ※Pressurized mist device: An electric pump that sprays water at pressure other than water pressure.
  • About installation location
    Install it in an outdoor place where an unspecified number of people pass.

Contents of support

Details
Dedicated meterContents of Support
If there isExemption from the full amount of water charges used in the mist device
If notReduce the amount of water used assumed to have been used in mist devices

Period during which support such as reduction of taxes can be received

  • This applies to the period from May 1 to October 31.
    The period of reduction and exemption may change depending on the date of the grant, the operation status of the mist device, etc. Please check with the person in charge for details.
  • You can receive a reduction or exemption for a total of three years.
    For applications submitted in FY2019, reductions can be made up to a total of four years.

Flow of Support

General case
StepContents
Prior consultation with Water Works Bureau
※By consulting in advance, subsequent procedures will be smoother.
Complete installation of mist equipment
Submission of application such as reduction of water rates
※Including the submission of a copy of the equipment performance certificate and the land use permit

Notification of decision on examination and reduction of taxes (start of reduction of taxes, etc.)
※Even if the application documents are not incomplete, it will take a period of 2-3 weeks to determine the tax exemption.


Documents to be submitted

  1. Application for reduction of water fee due to the operation of mist equipment
  2. Equipment performance certificate (for which the amount of water used can be confirmed in hourly units)
  3. Copy of land occupation permit (such as when road occupation is required)

Submission address

Corporate Planning Division, Water Works Bureau Management Department

Outline and style

Other initiatives related to the installation of mist equipment

Support by Economic Affairs Bureau (Yokohama City Shopping Street Environment Improvement Project)

In order to promote the creation of attractive shopping streets, Economic Affairs Bureau has implemented the Yokohama City Shopping Street Environment Improvement Support Project as a part of the cost of improving and enhancing the shopping environment.
Specifically, please see "Yokohama-shi shopping street environment maintenance support project".

Subsidies from Water Works Bureau (subsidy for water supply equipment associated with the installation of mist equipment)

In addition to reducing water charges, Water Works Bureau subsidizes water supply equipment construction costs when installing mist equipment that meets certain conditions (*) as part of measures against heat in summer.
For details, please refer to "Supplementary Subsidy for Water Supply Equipment Installation".
※In Economic Affairs Bureau's "Yokohama Shopping Street Environment Improvement Support Project", the shopping streets that are applying for mist equipment are eligible for support.

Hygiene management of mist equipment

Medical Care Bureau's awareness of hygiene management of mist generators

Medical Care Bureau flyer "Do you know? Hygiene management of mist generators
Medical Care Bureau flyer

Medical Care Bureau is raising awareness about the proper management of mist generators. Please refer to the flyer that summarizes the key points of hygiene management of mist generators and risks such as legionellosis in an easy-to-understand manner.

For inquiries regarding hygiene management of mist generators

Health Sanitation Division, Medical Care Bureau Health and Safety Department

For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Phone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Corporate Planning Division, Water Works Bureau Management Department

Phone: 045-671-3127

Phone: 045-671-3127

Fax: 045-212-1157

E-Mail address [email protected]

Return to the previous page

Page ID: 804-157-723

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews