現在位置
- Yokohama-shi Top Page
- Living, procedures
- Community Development and Environment
- Roads
- Construction
- Bridges
- News about Tsurumi River human road bridge maintenance news and construction
Last updated on September 13, 2023.
The text is from here.
News about Tsurumi River human road bridge maintenance news and construction
In commemoration of the opening of the Tsurumi River Human Road Bridge on March 24, 2025, the entire picture of the maintenance will be introduced in video. (External site)
September 13, 2023 Abutments on both banks and left bank piers have been completed! About (Tsurumi River human road bridge maintenance news (PDF: 3,613KB)))
September 26, 2022 Tsurumi River Human Road Bridge Substructure Construction (Part 2) Construction Explanatory Materials (PDF: 3,604KB)
September 26, 2022 Substructure work will be carried out on both banks of the Tsurumi River! About (Tsurumi River Hitodobashi News) (PDF: 2,479KB)
September 24, 2021 (tentative name) Tsurumi River Hitodobashi substructure construction work explanation document (PDF: 1,880KB)
About the newly established humanitarian bridge on April 21, 2021 (News on the development of humanitarian bridge between Shintsurumi Bridge and Sueyoshi Bridge) (PDF: 1,737KB)
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Bridge Division, Road and Highway Bureau Construction Department
Phone: 045-671-2791
Phone: 045-671-2791
Fax: 045-662-3945
E-Mail address do-kyoryo@city.yokohama.lg.jp
Page ID: 248-406-943