現在位置
- Yokohama-shi Top Page
- Business
- Menu by field
- Architecture and Urban Planning
- Construction-related procedures, laws and regulations, and approvals
- Permission, certification, designation, etc. based on the Building Standards Law
- Permission for relaxation of form regulations to promote the installation of renewable energy facilities (Article 52, Paragraph 14, Item 3 of the Building Standards Act, Article 53, Paragraph 5, Item 4, Article 55, Paragraph 3 and Article 58) Article 2)
Last updated on April 1, 2025.
The text is from here.
Permission for relaxation of form regulations to promote the installation of renewable energy facilities (Article 52, Paragraph 14, Item 3 of the Building Standards Act, Article 53, Paragraph 5, Item 4, Article 55, Paragraph 3 and Article 58) Article 2)
Notice
We have formulated permission standards for deregulation of form regulations to promote the installation of renewable energy facilities. (March 19, 2025)
・Permission criteria based on the provisions of Article 52, Paragraph 14, Item 3 of the Building Standards Act
・Permission criteria based on the provisions of Article 53, Paragraph 5, Item 4 of the Building Standards Act
・Permission criteria based on the provisions of Article 55, Paragraph 3 of the Building Standards Act
・Permission criteria based on the provisions of Article 58, Paragraph 2 of the Building Standards Act
Overview of the System
Buildings that perform necessary construction for the installation of renewable energy use equipment in buildings in Yokohama City (PDF: 478KB) that conforms to the special application requirements stipulated in the "Plan for Promotion of Installation of Renewable Energy Use Equipment in Buildings in Yokohama City" For those that are structurally unavoidable, Article 52, Paragraph 14, Item 3 of the Building Standards Act (things that do not interfere with traffic, safety, fire prevention, fire prevention, fire prevention and hygiene) Article 5, Article 5, Article 5, Article 5) and hygiene, Article 5, Article 5, Article 5, Article 5, Article 5, Article 3) with Article 3)
Permit criteria
Floor area ratio
- Permission criteria based on the provisions of Article 52, Paragraph 14, Item 3 of the Building Standards Act (PDF: 324KB) (developed on March 19, 2025, enforced on April 1, 2025)
Building coverage ratio
- Permission criteria based on the provisions of Article 53, Paragraph 5, Item 4 of the Building Standards Act (PDF: 313KB) (developed on March 19, 2025, enforced on April 1, 2025)
The height of buildings in the first-class low-rise residential area, etc.
- Permission criteria based on the provisions of Article 55, Paragraph 3 of the Building Standards Act (PDF: 307KB) (developed on March 19, 2025, enforced on April 1, 2025)
Altitude Area
- Permission criteria based on the provisions of Article 58, Paragraph 2 of the Building Standards Act (PDF: 363KB) (developed on March 19, 2025, enforced on April 1, 2025)
Flow of Procedure
- Flow of Permission Procedure (PDF: 213KB)
- 2025 Yokohama-shi building examination committee, secretary meeting relations schedule (PDF: 790KB)
(Reference Materials)
Format download
- Building permit prior consultation slip (Excel: 19KB)
- Permission application ・ No. 43 style (word: 57KB)
<Fees>
・160,000 yen (in the case of floor area ratio, building height and permission of altitude district)
・33,000 yen (in the case of permitting the occupancy rate)
- Permit application summary
・Permission (Excel: 20KB) based on the provisions of Article 52, Paragraph 14, Item 3 (floor area ratio) of the Building Standards Law (Excel: 20KB)
・Permission (Excel: 19KB) based on the provisions of Article 53, Paragraph 5, Item 4 of the Building Standards Act (building occupancy rate) (Excel: 19KB)
・Permission (Excel: 19KB) based on rule of Building Standard Act Article 55 Clause 3 (height of building) and Article 58 Clause 2 (altitude district) and permission (Excel: 19KB)
- Dissemination Status Report of Neighborhood Residents (Word: 40KB)
- Explanation status report for local organizations (word: 46KB)
- Notes on dissemination to nearby residents and explanation to local organizations (PDF: 106KB)
- Plan change approval for permission and certification (word: 19KB)
- Notification of plan change (word: 21KB)
- Name change notification (word: 23KB)
- Notification of withdrawal (word: 22KB) (when we cancel plan before receiving permission after application)
- Notice of cancellation (word: 22KB) (when we cancel plan after receiving permission)
How to submit and receive each document
It is basically handled at the counter, but some materials can also be handled by mail.
If you would like to send it by mail, please see "In mailing each document (PDF: 529KB)".
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Urban Building Division, Housing and Architecture Bureau Building Guidance Department
Phone: 045-671-4525
Phone: 045-671-4525
Fax: 045-681-2438
E-Mail address kc-shigaichikenchiku@city.yokohama.lg.jp
Page ID: 772-758-459